![]() |
|
Second Flow Test at Antelope-5 - Printable Version +- ShareholdersUnite Forums (http://shareholdersunite.com/mybb) +-- Forum: Companies (http://shareholdersunite.com/mybb/forumdisplay.php?fid=1) +--- Forum: InterOil Forum (http://shareholdersunite.com/mybb/forumdisplay.php?fid=4) +--- Thread: Second Flow Test at Antelope-5 (/showthread.php?tid=9714) Pages:
1
2
|
Second Flow Test at Antelope-5 - petrengr1 - 02-10-2016 The second flow test at Antelope-5 commenced on Janurary 6th with a plan to flow the well approximately 2 weeks at approximately 50 MMCFD and then shut-in the well in for a couple of weeks before pulling the pressure recorders. They expected the test to take about one month. One month would be February 6th. They should have the results of the test by now. When will we hear? RE: Second Flow Test at Antelope-5 - wapitidropiti - 02-10-2016
'petrengr1' pid='66534' datel Wrote: With todays PPS down $1.50 maybe some are hearing early. RE: Second Flow Test at Antelope-5 - Stavros - 02-10-2016 Drops: IOC's PPS was down, in-line with others in the Oil Patch ... check XOP as an example of the trend when oil price plummets. IOC's volume was 346k shares traded. This does not indicate advanced knowledge of anything - - - be it good or bad news. RE: Second Flow Test at Antelope-5 - wapitidropiti - 02-10-2016
'Stavros' pid='66541' datel Wrote:Drops: IOC's PPS was down, in-line with others in the Oil Patch ... check XOP as an example of the trend when oil price plummets. IOC's volume was 346k shares traded. This does not indicate advanced knowledge of anything - - - be it good or bad news. Stavros, Yes I agree. 364K is just plain ordinary for ol' IOC. We wait. RE: Second Flow Test at Antelope-5 - johnwgrant - 02-11-2016 Petengr1, Before I begin, I want to add my personal thanks for all the information and intelligent insights you have added to this board over the years. I do have a question or two (4?) for you that I would enjoy hearing your thoughts on... 1) Is the thickness of the reservoir at ANT-6 what was expected at this location ? 2) Knowing the thickness of the reservoir at ANT-6 (although porosity is still unknown), does this jive with the lagoon model that IOC was putting forth in their latest presentations? 3) If we find dolomite here, does it imply that the lagoon model is incorrect (or perhaps we do not know the exact location of the lagoon)? 4) How important is an ANT-7 to TOTAL. In other words, if TOTAL knows that there is plenty of gas for 2 trains, what would be their incentive to drill ANT-7 before certification? Would TOTAL want to build a 3 train plant ? Or, in the current world of cheap oil/gas, would that be a crazy thought !??! Thanks in advance !!! (Of course, I would enjoy hearing others thoughts as well!!!) RE: Second Flow Test at Antelope-5 - petrengr1 - 02-11-2016
John- I will give you my opinion but sometimes it is not worth much.
1) Is the thickness of the reservoir at ANT-6 what was expected at this location ?
Comment: The map they showed indicated that they expected the top of the zone to come in at about -2,000 meters sub sea. It actually came in at -2,076 meters sub sea so they found the zone about 76 meters (249 feet) lower than expected. Their press release said it came in with-in expectations so they must have had a range let’s say -1,900 meters sub sea to -2,100 meters sub sea.
2) Knowing the thickness of the reservoir at ANT-6 (although porosity is still unknown), does this jive with the lagoon model that IOC was putting forth in their latest presentations?
Comment: One might think that if a lagoon existed it would be lower than where the reef might be expected. If that is what they believed why didn’t they map it that way? The map showed more or less flat contour lines and no “sink hole”.
3) If we find dolomite here, does it imply that the lagoon model is incorrect (or perhaps we do not know the exact location of the lagoon)?
Comment: Yes, I think that if we find a good thickness of high porosity limestone and/or dolomite it could cast some doubt on the lagoon model. Of course, as you suggest, it could just mean that the lagoon is further east or northeast. I am hoping that if there is a lagoon that that lower quality rock will be below the gas/water contact to the east or northeast. I am not confident that they can tell the difference between lagoon type rock and good porosity limestone/dolomite based on their seismic data which is all they have to use in this area of the field.
4) How important is an ANT-7 to TOTAL. In other words, if TOTAL knows that there is plenty of gas for 2 trains, what would be their incentive to drill ANT-7 before certification? Would TOTAL want to build a 3 train plant ? Or, in the current world of cheap oil/gas, would that be a crazy thought !??!
Comment: I certainly cannot speak for Total since their decision will depend on many things, their other plans and projects, their cash position, present market conditions etc. However I would think they would like to know the true size of the reservoir in order to have a long term plan for the future of Papua LNG. I would not think they will be influenced too much by the present price of oil since we have been watching these boom/bust cycles in the oil industry for over a hundred years. The price has always gone up in the long term. I remember when the price of oil was $3/Bbl and we sold gas in 30 year contracts for $0.05/MCF. I think you are right that they know there is enough gas for two trains so if they drill Antelope-7 they will be trying to prove that there is enough gas for 3 trains. It is probably not too important to them to delay the payment since they would only save a few months of interest on the inevitable payment. Of course we would hope that the payment would be a bit larger.
RE: Second Flow Test at Antelope-5 - Stavros - 02-11-2016 Another option is to build two larger LNG Trains of 5.5 million tons per annum instead of three Trains at 3.4 million tpa. That would save a lot of capital cost. The LNG Trains at Yamal will eventually be 5.5 million tpa each. RE: Second Flow Test at Antelope-5 - Putncalls - 02-11-2016 OSH is still talking 1 or 2 trains. RE: Second Flow Test at Antelope-5 - jft310 - 02-11-2016 Puts -Oil Search must admit a huge potential payment if they start talking GLJ size quantities . Including setting aside money for the larger payment . Thus OSH has a reason to use the older GCA outdated not current numbers . Will GLJ be doing Interoil's reservoir work for 2015 end ??? How many different reservoir engineering firms need to weigh in ??? OSH and PAC have chosen GCA and NSAI from the list of 5 . GLJ is not on the list of 5 . Why wouldn't the partnership all use the same 2 engineering firm estimators ????A third firm just stirs the pot . Shortly we will know . RE: Second Flow Test at Antelope-5 - petrengr1 - 02-11-2016
'Stavros' pid='66562' datel Wrote:Another option is to build two larger LNG Trains of 5.5 million tons per annum instead of three Trains at 3.4 million tpa. That would save a lot of capital cost. The LNG Trains at Yamal will eventually be 5.5 million tpa each. Stavros- Thanks for your input. It is always good to hear from an expert on the subject. It sounds like a great idea to build two 5.5 mtpa plants simultaneouslly if we have something like 10 TCF. I assume they would build them simultaneously in ordrer to realize thosse massive saviings in captial cost. So we would end up with a plant capacity of 11 mtpa much sooner than we would if they use 3.5 mtpa trains. In that case they would probably only build two trains at the same time and the third one would be added later. So we not only get a slightly larger total plant capacity (11 mtpa vs 10.5 mtpa) but we get it much sooner and at much less cost than the three 3.5 mtpa trains. I believe this is what you are telling us. |