Bloomberg on Botten - Printable Version +- ShareholdersUnite Forums (http://shareholdersunite.com/mybb) +-- Forum: Companies (http://shareholdersunite.com/mybb/forumdisplay.php?fid=1) +--- Forum: InterOil Forum (http://shareholdersunite.com/mybb/forumdisplay.php?fid=4) +--- Thread: Bloomberg on Botten (/showthread.php?tid=7121) |
RE: Bloomberg on Botten - kommonsents - 07-23-2014 If you are referring to my post above, getit, that is not what I said. I said "The process is within about a year for expansion with a new train at PNG LNG versus a new IOC/Total/OSH plant." In other words, there is only about a one year, more or less, difference in time required to get the new LNG plant up and running versus a 3rd train expansion at PNG LNG. The point being that it really is not to IOC/Total/OSH benefit to sell gas to PNG LNG because there appears to be no real time advantage. RE: Bloomberg on Botten - ArtM72 - 07-23-2014
'Getitrt2' pid='47625' datel Wrote:I don't think there is any way in the world a deal could be negotiated among IOC/Total/OSH and PNG LNG, PRL 15 appraisal completed, reach FID, and start production of a third train with E/A gas in one year, not even close, not to mention other critical issues; and I don't think there is even any worthwhile discussion to be had, including here. I believe the point made by Kommon was that it will only take a year longer to build a greenfield plant than a PNG LNG 3rd unit. That might be understating it a bit, but I doubt we are talking two years difference. In any event in a time of very low interest rates even two years difference doesn't seem like a whole lot. RE: Bloomberg on Botten - Getitrt2 - 07-23-2014 You're right, I did misunderstand his first post, sorry. We are actually in agreement, it appears! RE: Bloomberg on Botten - Stavros - 07-23-2014 The fact is that an expansion of the PNG LNG Complex to add one or two more trains would take 30-36 months from the point in time that capital expenditure is approved by the JV Partners. That means startup in late 2017 if they start in the coming few months with ordering the Long Lead Equipment such as major compressors and turbines and cryogenic heat exchangers. The following already exist for PNG LNG, which allows them to progress the project on a fast track because it would be essentially a duplicate of the first two trains. + Basis of Design + Basic Engineering + Detail Engineering + Equipment Specifications + Scope of Construction Contract (ie can hire the same contractors with no need to negotiate the Terms and Conditions) + Project Funding ( which requires all of the above ) + Site Preparation + Jetty and Logistics + Storage Tank Design + etc and etc and etc To do all the above for a Gulf-located green field site will take a minimum of 6 years to my opinion. Can it be done in 5 years? + YES if the location is in the US. - NO in PNG. That means startup of a Gulf LNG plant in 2020 or later. If you want to be unrealistic, then keep on thinking that a new Gulf LNG project can come onstream by 2018. RE: Bloomberg on Botten - jft310 - 07-23-2014 Best to listen to those in the biz like Stavros vs arm chair quarterbacks.IMHO. What will happen not sure. RE: Bloomberg on Botten - Getitrt2 - 07-24-2014 Another basic fact, however, is that there is no way PNG LNG is going to start a train 3 project in the next few months. They haven't even confirmed adequate gas for it yet or where that would come from. It appears P'nyang would have to be part of that, where they still have a lot of study, drilling, and testing to do, and which is not even part of the PNG LNG JV at this point. It is also much further back into the mountains beyond Hides and the CSP, requiring another new extensive compressor-driven pipeline project through the mountains. Even when Exxon was negotiating for E/A gas, further appraisal drilling was going to be required into 2015 for that. Then there is marketing and financing to be accomplished for FID. RE: Bloomberg on Botten - sydbod - 07-24-2014 While doing this speculation , the following is worth remembering. Without the 2 wells at well-pad G at Hides, the PNGLNG has sufficient gas flow capacity from its current wells to easily feed 2 LNG trains and then some (am talking of production rate, rather than production life). Well-pad G has one well completed and the second one almost completed (both still not connected). With this extra they can easily feed 3 LNG trains, and the pipeline capacity can handle the gas requirements currently for 3 trains also. There would be not much work to integrate a 3rd train into PNGLNG, and it could be done very quickly indeed. There would be no issue with connecting P'Nyang and its pipeline at a later date to the system to maintain the production life time of the total project. Once the partners are happy they have enough gas for the 3rd train, we may all be surprised at just how fast it does get built. The 4th train is what takes more time because extra compression pumping stations would be required to get that much gas through the current pipeline, and probably P'Nyang would have to be connected or else Hides Deep would have to be proven and connected as a minimum. RE: Bloomberg on Botten - kommonsents - 07-24-2014
'Getitrt2' pid='47645' datel Wrote:Another basic fact, however, is that there is no way PNG LNG is going to start a train 3 project in the next few months. They haven't even confirmed adequate gas for it yet or where that would come from. It appears P'nyang would have to be part of that, where they still have a lot of study, drilling, and testing to do, and which is not even part of the PNG LNG JV at this point. It is also much further back into the mountains beyond Hides and the CSP, requiring another new extensive compressor-driven pipeline project through the mountains. Even when Exxon was negotiating for E/A gas, further appraisal drilling was going to be required into 2015 for that. Then there is marketing and financing to be accomplished for FID. That would indicate Train 3 coming online around 2019, more or less, or about a year sooner than a new greenfield LNG plant RE: Bloomberg on Botten - ArtM72 - 07-24-2014
'Stavros' pid='47639' datel Wrote:The fact is that an expansion of the PNG LNG Complex to add one or two more trains would take 30-36 months from the point in time that capital expenditure is approved by the JV Partners. That means startup in late 2017 if they start in the coming few months with ordering the Long Lead Equipment such as major compressors and turbines and cryogenic heat exchangers. The following already exist for PNG LNG, which allows them to progress the project on a fast track because it would be essentially a duplicate of the first two trains. + Basis of Design + Basic Engineering + Detail Engineering + Equipment Specifications + Scope of Construction Contract (ie can hire the same contractors with no need to negotiate the Terms and Conditions) + Project Funding ( which requires all of the above ) + Site Preparation + Jetty and Logistics + Storage Tank Design + etc and etc and etc To do all the above for a Gulf-located green field site will take a minimum of 6 years to my opinion. Can it be done in 5 years? + YES if the location is in the US. - NO in PNG. That means startup of a Gulf LNG plant in 2020 or later. If you want to be unrealistic, then keep on thinking that a new Gulf LNG project can come onstream by 2018. All good points, Stavros. One thing we don't know is how far along IOC got in its previous plans for the CSP, LNG site, Jetty design etc. With a number of false starts behind them I would expect a fair amount of basic site work has been done that would normally be required for a true greenfield project. With respect to the CSP I would expect that, assuming GLJ's reserves estimate analysis was correct (they are, after all, a very experienced firm with a lot of big name clients), the preliminary design for at 7 or 8 MTPA plant has already been done and paid for. Now maybe all previous LNG prep work gets ash canned, but we shouldn't make the assumption nothing of IOC's prior efforts have time or money value. After all, their upstream and downstream efforts under the previous administration were VERY successful. RE: Bloomberg on Botten - sydbod - 07-24-2014
'kommonsents' pid='47648' datel Wrote: If we assume Well-pad G wells get connected by the end of this year (I expect a few months earlier as most likely), how long does it take to order the modules (identical to train 1 and 2) and progressively ship them as they get completed to PNGLNG and assemble them as they arrive? They can do the foundation work for the modules while the first modules are being built. If they were serious this should be possible to do over 1.5 to 2 years. My best guess would be train 3 coming online some time second half of 2016, or at least very early 2017 (first quarter). We have to wait untill Well-pad G wells get finished and neww reserves get calculated for Hides and for P'Nyang. therefore we have to wait untill the end of this year to see what is possible. It may even be worse that this because they may have to finish drilling Hides 5 well (PWD) to get a better understanding of where the water table precisely is before doing the new Hides reserve calculations, so things could stretch into 1st quarter of 2015 before they start train 3 should it be possible. |