RE: Points of interest from Nov. 14, 2014 presentation - petrengr1 - 11-18-2014
'ArtM72' pid='52074' datel Wrote:Pet - I was going to let this pass but since you brought it up I thought it might be interesting to follow. Slide 16 shows the well penetrating the reservoir from 2680 to 2780m. There seems little question that the vertical axis at least is to scale. So why have we been told 200 meters of limestone if the graphic shows 100m? Is it that downhole seismics give a lateral view of the adjacent structures that suggest in fact nearby the limestone is 200 meters? And the location actually drilled is the toe of a slip fault (pardon if the terminology is wrong), below which significant reservoir potential remains un tapped by the drill? Thanks for your continued insights and generous contributions of your time.
Art- I think the 100 meter error on the chart is just due to the accuracy of the artist. Has nothing to do with downhole seismics lateral view etc. Regarding reservoir potential below it does appear, accordig to chart 16, that if the next well is moved to the position where the two limestone zones overlap above and below the Raptor thrust fault it is possible that we could find hydrocarbons in both zones. The well would drill through the limestone twice and the lower zone as drawn indicates the lower zone is a high against the fault. This would form a trap and should contain gas/condensate.
If you go to http://www.petrorubiales.com/ and look at chart 34 of their November Investor presentation you will find a more understandable chart and a map with a scale on it. The map shows a field 10 km long. Unfortunately I think it is based on the pre-drill map from http://tinyurl.com/m32z6ho page 20.
RE: Points of interest from Nov. 14, 2014 presentation - ArtM72 - 11-18-2014
'petrengr1' pid='52092' datel Wrote:
'ArtM72' pid='52074' datel Wrote:Pet - I was going to let this pass but since you brought it up I thought it might be interesting to follow. Slide 16 shows the well penetrating the reservoir from 2680 to 2780m. There seems little question that the vertical axis at least is to scale. So why have we been told 200 meters of limestone if the graphic shows 100m? Is it that downhole seismics give a lateral view of the adjacent structures that suggest in fact nearby the limestone is 200 meters? And the location actually drilled is the toe of a slip fault (pardon if the terminology is wrong), below which significant reservoir potential remains un tapped by the drill? Thanks for your continued insights and generous contributions of your time.
Art- I think the 100 meter error on the chart is just due to the accuracy of the artist. Has nothing to do with downhole seismics lateral view etc. Regarding reservoir potential below it does appear, accordig to chart 16, that if the next well is moved to the position where the two limestone zones overlap above and below the Raptor thrust fault it is possible that we could find hydrocarbons in both zones. The well would drill through the limestone twice and the lower zone as drawn indicates the lower zone is a high against the fault. This would form a trap and should contain gas/condensate.
If you go to http://www.petrorubiales.com/ and look at chart 34 of their November Investor presentation you will find a more understandable chart and a map with a scale on it. The map shows a field 10 km long. Unfortunately I think it is based on the pre-drill map from http://tinyurl.com/m32z6ho page 20.
Thanks, Pet for the interpretation. My general question would be whether they are doing borehole seismics and whether information gleaned from that contributed to the artist's rendering. Also, how far removed from the well bore itself that tool would be considered usefull. TIA
RE: Points of interest from Nov. 14, 2014 presentation - petrengr1 - 11-18-2014
'ArtM72' pid='52108' datel Wrote:
'petrengr1' pid='52092' datel Wrote:
'ArtM72' pid='52074' datel Wrote:Pet - I was going to let this pass but since you brought it up I thought it might be interesting to follow. Slide 16 shows the well penetrating the reservoir from 2680 to 2780m. There seems little question that the vertical axis at least is to scale. So why have we been told 200 meters of limestone if the graphic shows 100m? Is it that downhole seismics give a lateral view of the adjacent structures that suggest in fact nearby the limestone is 200 meters? And the location actually drilled is the toe of a slip fault (pardon if the terminology is wrong), below which significant reservoir potential remains un tapped by the drill? Thanks for your continued insights and generous contributions of your time.
Art- I think the 100 meter error on the chart is just due to the accuracy of the artist. Has nothing to do with downhole seismics lateral view etc. Regarding reservoir potential below it does appear, accordig to chart 16, that if the next well is moved to the position where the two limestone zones overlap above and below the Raptor thrust fault it is possible that we could find hydrocarbons in both zones. The well would drill through the limestone twice and the lower zone as drawn indicates the lower zone is a high against the fault. This would form a trap and should contain gas/condensate.
If you go to http://www.petrorubiales.com/ and look at chart 34 of their November Investor presentation you will find a more understandable chart and a map with a scale on it. The map shows a field 10 km long. Unfortunately I think it is based on the pre-drill map from http://tinyurl.com/m32z6ho page 20.
Thanks, Pet for the interpretation. My general question would be whether they are doing borehole seismics and whether information gleaned from that contributed to the artist's rendering. Also, how far removed from the well bore itself that tool would be considered usefull. TIA
Art - I think the borehole seismic is just used to fine tune the travel time through the formation so that the interpretation of existing seismic surveys can be improved. With the microphone in the bottom of the hole and the explosion at the top of the well they have an accurate direct vertical travel time they can use to improve the existing 2-D seismic. They apparently can also see below the bottom of the hole as evidenced with what they reported at Triceratops-2 i.e. another possible reservoir below the bottom of the drilled hole.
|