RE: Condensate questions - petrengr1 - 11-18-2014

(11-18-2014, 04:25 AM)Northoil Wrote:

PE - OK great. Thanks. Re the re-injection - I don't know how any decision can be made at this point not to cycle. It may not even be in their hands. Total might take a longer view and the government may not want to leave liquids behind, from a national resource conservation viewpoint. Timing is relevant, too. In the case of Arun, the LNG trains could not be constructed as fast as what it took to start cycling. I don't know if they converted existing appraisal wells. Obviously, richness is the most important factor and I've seen nothing on that.

Thanks again.

North- As you know there has been a lot of work done for many decades to get to the best way to produce a retrograde condensate reservoir. Even though Arun was cycled I believe they still started producing before recovering most of the liquids. After they let the reservoir pressure drop they had liquids falling out around the well bores where the pressure was lower. This caused restrictions to the rate of flow of the gas to the well bores. This may be what pushed them toward a lot of horrizontal  wells. Anyway I think they were pushed to proceed with the LNG project early because of the present worth of the LNG to be produced. This is what everyone really should be looking at i.e. both companies and governments. Everyone should want to maximize the net worth of their holdings.

The liquid content of Antelope is not really that high by world standards. GLJ gives them about 15 bbl/MMCF. May be less after the reservoir pressure drops and liquids start dropping out in the reservoir.




RE: Condensate questions - Northoil - 11-18-2014

PE - thanks again. You're right about Arun - they only cycled for 2 years before gas production for LNG. And yeah, 15bbl is pretty modest. I think Arun was 27bbl. Also, I agree maximization is the goal but that has a lot of moving parts. I'm sure they'll make the best decision at the proper time.