![]() |
||||
|
Output vs Regas Mismatch Looming - Printable Version +- ShareholdersUnite Forums (http://shareholdersunite.com/mybb) +-- Forum: Companies (http://shareholdersunite.com/mybb/forumdisplay.php?fid=1) +--- Forum: InterOil Forum (http://shareholdersunite.com/mybb/forumdisplay.php?fid=4) +--- Thread: Output vs Regas Mismatch Looming (/showthread.php?tid=8907) |
||||
RE: Output vs Regas Mismatch Looming - Palm - 07-31-2015 This year, Pakistan, Egypt, Jordan and Uruguay plan to begin importing natural gas via floating storage and regasification unit (FSRU) vessels. The vessels are a solution to the challenge of importing liquefied natural gas (LNG) into areas that lack sufficient transfer and regasification terminals onshore. These vessels provide solutions for small-market gas demand regions and as temporary solutions for where future onshore regasification facilities are planned.
The FSRU vessels are capable of transporting and storing LNG, and then regasifying LNG onboard to deliver volumes into offshore terminals or onshore receiving terminals. Offshore facilities typically include a buoy and connecting undersea pipelines to transport regasified LNG to shore. Onshore receiving terminals typically include large deepwater docks and takeaway pipeline infrastructure. Both types of facilities might also include gas processing equipment and natural gas liquids (NGLs) storage facilities. According to the US Energy Information Administration, a total of 16 FSRUs serve the global market as transportation and regasification vessels. An additional five vessels, which have been converted into FSRUs from conventional LNG vessels, are permanently moored. London-based Golar LNG owns four currently operational FSRUs, all based on conversions of LNG carriers. These are the Golar Spirit (operating in Brazil), Golar Winter (Brazil), Golar Freeze (Dubai) and Nusantara (Indonesia). Its newbuilds include the Golar Eskimo (Jordan), Golar Igloo (Kuwait) and Golar Tundra (for Marshall Islands in November 2015). Antwerp-based Exmar owns the FRSU Toscana (Italy) and is building its to-be-named floating regasification barge for Liberia work. Texas-based Excelerate Energy operates the largest fleet of FSRUs in the industry. Its vessels are purpose-built LNG tankers that can vaporization LNG and discharge natural gas as a liquid at a conventional LNG receiving terminal, or as gas through the FSRU’s connection with a subsea buoy in the hull of the ship, or as gas through a high-pressure gas manifold from the vessel’s LNG loading arms. Excelerate’s fleet include its Excalibur Class, Excelsior Class, Explorer Class, Experience Class, all built by Daewoo Shipbuilding & Marine Engineering. Already the world’s largest LNG carrier operator, Mitsui O.S.K. Lines (MOL) plans to build, own and operate an FSRU with a storage capacity of 263,000 cu m of LNG—making it the world’s largest. The vessel will be built by Daewoo Shipbuilding & Marine Engineering Co. for delivery by September 2016.
Norway-based Hoegh owns the PGN FSRU Lampung at a purpose-built mooring system in the Lampung Province at the southeast coast of Sumatra, Indonesia. The company also owns the GdF Suez Cape Ann that is employed as China’s first FSRU in Tianjin, China. Hoegh’s Hoegh Gallant is working as an LNG import terminal (FSRU) in Ain Sokhna, Egypt, and its Independence is working as an LNG import terminal in Klaipeda, Lithuania. On 27 March, Pakistan received its first FSRU-sourced LNG shipment into its newly developed receiving infrastructure near Port Qasim, Karachi via Excelerate Energy’s FSRU, the Exquisite. The shipment of 147,000 cu ft of LNG from Qatar docked at Engro Corp.’s Elengy Terminal Pakistan Limited. After regasification, the gas was injected into the Sui Southern Gas pipeline for further transportation and final sale to power generators in Punjab. Later shipments will be used as compressed natural gas and as feedstock for fertilizer companies. Meanwhile, Egypt recently suspended gas exports and seeks gas imports to feed its growing consumption demand. The country began developing plans for an offshore regasification terminal in 2012, and received its first LNG cargo in early April. Jordan is struggling to meet its own demand after Egypt suspended pipeline exports to the country, and has since secured an FSRU vessel to be moved to offshore Aqaba, accompanied by a 500 MMcf/d regasification terminal that is scheduled to come online in May 2015. Uruguay is building infrastructure for an offshore 400 MMcf/d regasification terminal near Montevideo, which is expected to be completed in 2016. The facility will supply its domestic market and could provide exports to Argentina. Originally planned to come online in mid-2015, the regasification terminal has been delayed until 2016. Elsewhere, four other floating regasification terminals are planned in the next few years for Colombia, the Dominican Republic, India, and the Philippines. However, in Colombia, Pacific Rubiales delayed its acceptance of the delivery of an Exmar FSRU, and agreed to sell approximately 43% of its interests in Pacific Midstream (which owns the ODL and Bicentenario pipelines, the Petroelectrica power transmission line, and the future LNG project), to the International Finance Corp. and a consortium of investors in December 2014. The company received $240 million in cash in December 2014 and the remaining $80 million is expected to be received sometime in 2015 upon completion of certain condition precedents and the completion and transfer of the LNG project. Floating regasification was first deployed in the US Gulf of Mexico in 2005 and has since been employed in Argentina, Brazil, China, Indonesia, Israel, Italy, Kuwait, Lithuania, and the United Arab Emirates. RE: Output vs Regas Mismatch Looming - Spartina - 07-31-2015 Good stuff Palm - thanks. RE: Output vs Regas Mismatch Looming - Tusker - 07-31-2015 Nice work you do - thanks 2. RE: Output vs Regas Mismatch Looming - Stavros - 08-01-2015 This is how they do the conversions of LNG carriers to FSRU's. It's the Golar Nusantara. It's not very expensive to make the conversion. The reported contract price of 20 Million Singapore Dollars back in 2011 was equivalent to about US$ 16 Million. http://www.offshoreenergytoday.com/singapore-sembcorp-secures-fsru-conversion-contract-with-golar-lng/ Singapore: Sembcorp Secures FSRU Conversion Contract with Golar LNG Jurong Shipyard, a wholly-owned subsidiary of Sembcorp Marine, has secured an approximately S$20 million contract from Golar LNG Energy to convert the LNG Khannur, a Liquefied Natural Gas (LNG) tanker, to a Floating Storage and Regasification Unit (FSRU) to be renamed West Java FSRU. The 125,000-cbm LNG tanker, which arrived in Jurong Shipyard recently, will be converted into a FSRU capable of producing 500 MCFD (million cubic feet per day) of gas, with a regasification capacity of approximately 3.8 MTPA (million metric tonnes per annum). The West Java FSRU represents Golar’s fourth FSRU project for PT Nusantara Regas, a joint venture between Pertamina and PGN. On conversion completion, the vessel will be installed 15km offshore Muara Karang, Jakarta Bay, in Indonesia, where it is contracted to operate until the end of 2022, with provision for further automatic extension options to 2025 subject to certain contract conditions. The West Java FSRU project will be Indonesia’s first LNG regasifaction terminal and represents the first FSRU project in Asia. The contract is not expected to have any material impact on the consolidated net tangible assets per share and earnings per share of Sembcorp Marine for the year ending December 31, 2011. RE: Output vs Regas Mismatch Looming - Tree - 08-01-2015 FRSU's are likely a small part of the future of re-gasification. FRSU's have a big drawback - less capacity. FRSU's offer flexibility to the large LNG importers like JP and SK but they cannot supplant the efficiencies of onshore re-gas plants, where onshore pants are feasible. Notice that FRSU's are employed in small markets and difficult to access ports in those markets. Papua LNG gas will go to premium buyers in premium markets, JP, SK and CH where onshore capacity exists and will be built out. Check out the list of re-gas projects and liquefaction which have been cancelled and suspended. Chit load of planned re-gas is dead, stalled and delayed. Gulf LNG shown as 'cancelled' as of July, likely due to a simple name change as Gulf LNG does not exist. http://www.globallnginfo.com/world%20lng%20plants%20&%20terminals.pdf RE: Output vs Regas Mismatch Looming - Palm - 08-02-2015 Reality is that the LNG industry is maturing and as always this results in better, less expensive production methods and the money goes there. No need to repeat the expected low costs of Papua LNG. Total is stating it clearly. They are engineering this project to be very low cost and there's little doubt they will succeed and the LNG from the project will get purchased. That's what we care about. We can say what we want but our LNG contracts ARE affected by oil prices. The Certification has the set price per the SPA but contracts to be done reflect oil prices. Buyers of energy fuel are not stupid and when oil spiked back up to $100 China and others shifted back to more coal and alternative energy mixes. That's documented. And it makes sense. Coal was mandated by the US government many years ago because it was plentiful in the US and the power industry eventually engineered plants to be highly efficient and once fitted with scrubbers pollutants are greatly reduced. That's been fine until the global warming/CO2 issue came along. Now the power industry is gradually shifting to more renewables and natural gas. In Ohio people have been screaming about all the gas that's being found and coal still being burned. Guess what? Ground is being broken on new gas-fired plants as infrastructure and conditioning plants have been built. So the great shift to NG is on. Takes time. This is happening around the world and gas is still projected to be big for electric generation. In fact last month in the US for the first time, NG for electric generation passed coal as 31% was produced by NG, 31% by coal. It's happening and NG will be the new king of generation fuels around the world. But it demands lower costs; Asia has been screaming about this for the last several years. Papua LNG will get built and be very low cost. Contracts will be lower than those of the past but will be very profitable. Low cost dependable energy fuel will always win out. RE: Output vs Regas Mismatch Looming - Thylacine-2 - 08-02-2015 Palm, when do the contracts need to be inked? I expect oil prices to be substantially higher in six months to a year. It would be a more favorable climate for contracts when the price recovery is clearly underway. RE: Output vs Regas Mismatch Looming - Putncalls - 08-02-2015 Well put Palm. I guess IOC is the ugly duckling and the oil music just stopped playing. IOC might even get the chair that the Australian players wanted. RE: Output vs Regas Mismatch Looming - Palm - 08-02-2015
'Thylacine-2' pid='61252' dateline='<a href="tel:1438446 Wrote:Palm, when do the contracts need to be inked? I expect oil prices to be substantially higher in six months to a year. It would be a more favorable climate for contracts when the price recovery is clearly underway. And that's why Total is saying they are in no great hurry on the contracts. They in effect have nothing to sell until they get Certification done, PDL's etc applied for/approved, and have the proposed project approved. Most of the gass will have to be contracted for FID to occur. They are saying FID in 2017, so that's a rough timeframe. Doesn't mean they aren't being approached now, but they have no reason now to enter into contracts. They need to work through this concept engineering to get the costs as low as possible. Then they have some basis for negotiating. That was the crux of the message from Total the other day (and BTW today the are officially Operator); we will take our time and get this right, and when we do this likely will be the lowest cost project to come along. Buyers will line up and we will have a very nice IRR that others can't even think about. RE: Output vs Regas Mismatch Looming - Palm - 08-02-2015 This is from Total's website and explains some of their precesses in getting an LNG project up and running. Mentions getting contracts in place sometimes "well ahead of FID" but that doesn't necessarily mean at the stage Papua LNG is today. They are more than thorough as any of these Operators are. "Total’s talent for managing liquefied natural gas (LNG) projects is on par with our prominent rank in this highly competitive industry. From securing contracts to managing the construction of LNG facilities, we possess the full range of capabilities needed to get to grips with the complexities of this unique type of development.
|