RE: Total selects Elk-Antelope plan - Palm - 07-02-2015

Still say OSH. By spilling location not being in Gulf hopes may be to try and stir the boiling pot bit.


RE: Total selects Elk-Antelope plan - Tree - 07-02-2015

Can't come as a surprise to any pygmy, cannibal or witch doctor that the preferred liquefaction site may be announced as adjacent to PNG LNG. PM neighborhood has always been the preferred site. IOC's 2009 PA dictated a PM location before chiseler Phil wheeled and dealed IOC into a 'Gulf Location' which had untold risk and challenges and was doomed from the start. Stirring the Long Pig Soup Pot at this time by a JV partner is a stretch, but I understand you are on vacay and have likely been into the Bloody Mary's.


RE: Total selects Elk-Antelope plan - Palm - 07-02-2015

I wish. Whoever leaked obviously had/gave bad info. No different than deal announcement getting leaked with low T expectations. Doubtful it was leaked with good intentions. Rusty should know better.


RE: Total selects Elk-Antelope plan - Tree - 07-02-2015

Maybe JFT310 is Russell's source??...Sigh. We enjoy some quiet moments.


RE: Total selects Elk-Antelope plan - Thylacine-2 - 07-02-2015

Phil's preference for a Gulf location, saving the pipeline cost, fit starting with a small low-cost modular plant. Had Somare stayed healthy we might have cash flow from LNG now. But for a big expensive two train plant with high probability of expansion trains.... Port Moresby.


RE: Total selects Elk-Antelope plan - Palm - 07-02-2015

As always; we enjoy some serenity as the clock ticks.


RE: Total selects Elk-Antelope plan - Tree - 07-02-2015

'Thylacine-2' pid='60092' datel Wrote:Phil's preference for a Gulf location, saving the pipeline cost, fit starting with a small low-cost modular plant. Had Somare stayed healthy we might have cash flow from LNG now. But for a big expensive two train plant with high probability of expansion trains.... Port Moresby.

Had IOC taken a SM partner as presented to Somare's Gov't in 2009 PA IOC would today be loading boats.  The Gulf scheme was classic ends justifying the means and in retrospect financing that scheme would have surely been most difficult.  I don't even want to contemplate the construction risk involved if IOC had been the Operator and was taking lead on construction in the Gulf.  EeeGads.  No wonder Duma threatened to yank IOC's PA.  Phil lead a Gulf goose chase and is what lead to internal strife between management and Phil and BoD and Phil and Phil got muscled out.  We are back to 2009 and TOT will announce then build this plant near PNG LNG.  We go 'xploring and selling in the meantime.




RE: Total selects Elk-Antelope plan - Palm - 07-02-2015

Phil's initial plan was stick-built adjacent to the refinery; and it made great sense. It was Kavo's relationship with Energy World CEO that swung the plan to Gulf. EWC was going to build a huge port development and this would allow IOC to go w/o a SM because EWC had the ultimate weapon (like they are building at Sengkang. No SM.

It all backfired along with FLNG when National Gov said niet. They required a SM and for 2nd plant wanted traditional plant. PNG said they would experiment with modular and FLNG later.

So clock was reset, Phil ousted and we are where we are. Russell shot some of his credibility in the foot trusting this "well placed" source. Well placed for whom?


RE: Total selects Elk-Antelope plan - Tree - 07-02-2015

'Palm' pid='60095' datel Wrote:Phil's initial plan was stick-built adjacent to the refinery; and it made great sense. It was Kavo's relationship with Energy World CEO that swung the plan to Gulf. EWC was going to build a huge port development and this would allow IOC to go w/o a SM because EWC had the ultimate weapon (like they are building at Sengkang. No SM. It all backfired along with FLNG when National Gov said niet. They required a SM and for 2nd plant wanted traditional plant. PNG said they would experiment with modular and FLNG later. So clock was reset, Phil ousted and we are where we are. Russell shot some of his credibility in the foot trusting this "well placed" source. Well placed for whom?

Me thinks his sources are Gov't based.  Guys that get some of the info and get most of that wrong.  Obvi he was deemed credible by Russ.  If the annuncements comes tomorrow is the source not credible?  How about next week?  This reminds me of Russ's report in April 2013 that 'Shell was tipped to join Elk Antelope' and they were finalizing the negotiations.  Ooooops 5 weeks later it's announced XOM has exclusivity to negotiate with IOC to JV into Elk/Ant.  Didn't mean Russ's sources were bad or devious, just at that time Shell was likely the winner.  We enjoy quiet moments.  Sigh.




RE: Total selects Elk-Antelope plan - Palm - 07-02-2015

You need to quit defending your brother. He always has been a liar. It's why your mom threw him out after he printed a story in the school paper that you were a kind and compassionate guy. Poor Rusty.