ShareholdersUnite Forums
Open Letter to RDS, CVX, TOT and XOM - Printable Version

+- ShareholdersUnite Forums (http://shareholdersunite.com/mybb)
+-- Forum: Companies (http://shareholdersunite.com/mybb/forumdisplay.php?fid=1)
+--- Forum: InterOil Forum (http://shareholdersunite.com/mybb/forumdisplay.php?fid=4)
+--- Thread: Open Letter to RDS, CVX, TOT and XOM (/showthread.php?tid=2434)

Pages: 1 2 3


Open Letter to RDS, CVX, TOT and XOM - Tree - 12-27-2012

Which one of you SM's will negotiate a friendly take-over of IOC 100%?

Benefits to you are as follows:

1)  Abbregate enough nattie for 12Mtpa LNG production overnight.

2)  Acquisition of a company with an intact Project Agreement, project only needs funding and ground breaks within weeks.

3)  Social mapping, engineering, surveying, land acquisitions are all complete or identified

4)  LNG specific labor and construction equipment are available on island immediately

5)  Unmatched exploration upside in a proven hydrocarbon basin

6)  PRL 15 gas cost is $.12 at the LNG plant while PNG LNG is ~ $7Mcf

7)  Remedy is to buy IOC for $3.5/M or $450 pps, add liquefaction costs of $3/M and your produced LNG costs are still LESS than PNG LNG dry gas cost.

8)  You have researched the resource and if you are willing to bid for a 30% chunk of 1 PRL it is to your greatest advantage to buy the whole operation.

9)  There is an eager PNG Gov't seeking a SM to bring credibility to their nation and this resource.

10)  Your shareholders will benefit greatest with an outright purchase.

Moving toward the front of the LNG development queue. 

The capital costs of Interoil‟s LNG development rank the lowest of all currently proposed or under-construction projects on both an absolute and per-unit basis. The lower cost structure makes the project price competitive and we expect it will allow early market penetration.

Break-even gas price

Our development model shows that InterOil would require a natural gas price of

US$(0.84)/mmcf for the initial 2 mtpa project to return a 15% IRR. The negative price is due

to the revenue generated by stripping liquids. Liquid Niugini Gas has estimated that

excluding this subsidy, the project would still only require a US$0.70/mmcf FOB natural gas

price to generate a 12% IRR.

Gulf LNG gas price

Gulf LNG Natural Gas price of US $.12/mmcf, with condensate subsidy, for a 12% IRR.  PNG LNG $7+/mmcf

Liquids revenue enhancement.

The proposed condensate stripping facility also allows for the extraction of high value condensate. We estimate that the stripping of liquids significantly enhances economics of this project. Given the already low cost structure, the liquids return actually makes the break-even gas price negative.

CSP operating cost.

We expect operating costs for the CSP will approximate US$14/bbl. In order to generate a 12% IRR, we expect the CSP will charge the upstream operators US$32.50/bbl. Should Mitsui elect not to swap their interest in the CSP project for a 2.5% interest in the Elk and Antelope Field, we understand that this charge could rise above US$50/bbl.

Economics of LNG and CSP  (EWC base plan, but you get the picture)

We forecast the complete project IRR is ~50%, which compares quite favourably to proposed or under-construction Greenfield projects mostly in the mid-teens.

 ~135% on first 2 mtpa investment and related condensate stripping facilities

 ~1,025% for a 1 mtpa expansion to immediately follow the greenfield investment

 ~50% for each internally funded 2 mtpa expansion.  

LNG development will generate significant FCF.

A prolific resource base, high liquids yield, and low plant costs, in our opinion, are what would make the development of Interoil‟s resource extremely attractive. We forecast the project could expand to 7 mtpa of capacity at which point gross annual free cashflow would reach about US$2.5b. We forecast the first 2 mtpa of capacity alone will generate ~US$9 of our US$11.38 InterOil 2014 CFPS estimate. Brownfield expansions should further enhance cash generation.

Prolific resource base requires low development investment.

We assume 6 wells are used for the initial 3 mtpa development. It should be noted that 4 of these wells have already been drilled during the exploration and appraisal of the Elk and Antelope Fields. In addition to the 2 wells required before start-up, we assume 2 additional wells are drilled at 10 and 15 years of production. We model these wells at a gross cost of US$35m. All-in, we expect these 10 wells will recover 5.1 tcfe of resource, or ~500 bcfe each.

Independent resource assessment  (FEB. 2011, mind you)

InterOil secured GLJ Petroleum Consultants Ltd. (GLJ) to provide an independent resource assessment of the Elk and Antelope fields. The effective date of the analysis was year-end 2009 and a complete report was returned to the company in February of 2010. GLJ is a well respected independent evaluation consultant for the oil and gas industry that has been in operation since 1972. The company has provided expert analysis and critical opinions for a broad array of client needs, including but not limited to financing, mergers, acquisitions, divestitures and public reporting. Roger Mahoney, the geophysicist retained by GLJ to provide the analysis, has over 35 years of experience in seismic acquisition, processing and interpretation. GLJ‟s conclusion was that the fields hold more than 11 tcf of OGIP and 9 tcf of recoverable wet gas. Condensate recoveries were estimated at 157 mmboe.

It is our understanding that the analysis performed by GLJ was completed with well data through drill stem test (DST) #1 at Antelope-2. Since that time InterOil has completed at least 6 more drill stem tests and a completed a 1,700 ft horizontal lateral. Further, these later test results have been very encouraging. Specifically, in September 2010 InterOil announced that during the horizontal leg the condensate-to-gas ratio stabilized at 24-27.7 bbls of condensate per mmcf. This observation is roughly 60% higher than the levels observed in DST #1, and may support positive revisions to prior estimates.

InterOil has not provided an interim resource assessment update which take into account these results. Our resource development model estimates a slightly higher level of recoverable resource as our analysis takes into account more recent drilling results. We estimate 9.4 tcf of gross gas resource will be developed (+15% versus GLJ estimate) and expect condensate recoveries may approach 210 mmbbls (+33% versus GLJ estimate).

Early exploration results have garnered global attention.

In March of 2009 InterOil reported that their Antelope-1 well flowed at an adjusted rate of 540 mmcfd. The company then broke their own record when in December of 2009 announcing the Antelope-2 well flowed at 775 mmcfd. These world record flow rate underscore how prolific the resource base in the region can be.




RE: Open Letter to RDS, CVX, TOT and XOM - Libtardius Maximus - 12-27-2012

Imminent is the word of the day.


RE: Open Letter to RDS, CVX, TOT and XOM - johnwgrant - 12-27-2012

I was tired of "soon" as well - IMMINENT sounds much better !!!

Aside to InterOil BOD: Get 'r Done !!!


RE: Open Letter to RDS, CVX, TOT and XOM - Gator - 12-27-2012

Tree,

As much as I respect what you say, your second point is incorrect. InterOil does not have a signed modified project agreement in hand. That has been part of the problem for the past six weeks. Phil talked about it, O’Neill wanted it, yet we are three days way from 2013 with nothing in writing.


RE: Open Letter to RDS, CVX, TOT and XOM - Tree - 12-27-2012

Actually Gator IOC has the NEC approval for 3.8Mtpa minimum start-up in the Gulf location. That = approval. What is lacking is an Operator and that will be chosen based on SD partner. Some may have LNG operatorship capabilities, few do however, or they will have a preferred LNG contract operator to hire based on scheme. Details on PA are only Gov't option %s and pricing. Formal PA doc and photo op will only come after Operator is named as that is a PA requirement. The amendments required have already been granted. IOC not having a signed PA in hand prior to naming SD and Operator is inconsequential today.


RE: Open Letter to RDS, CVX, TOT and XOM - johnwgrant - 12-27-2012

'Gator' pid='15222' datel Wrote:Tree, As much as I respect what you say, your second point is incorrect. InterOil does not have a signed modified project agreement in hand. That has been part of the problem for the past six weeks. Phil talked about it, O’Neill wanted it, yet we are three days way from 2013 with nothing in writing.



Tree - so, where do you think the problem lies? Is this the infamous "PNG time" where nothing gets done on time? Or, do you think they are at some sort of impasse regarding the "additional 27.5%"? Of course, Christmas/New Year's for politicians is built-in vacation time...


RE: Open Letter to RDS, CVX, TOT and XOM - Tree - 12-27-2012

'johnwgrant' pid='15224' datel Wrote:

'Gator' pid='15222' datel Wrote:Tree, As much as I respect what you say, your second point is incorrect. InterOil does not have a signed modified project agreement in hand. That has been part of the problem for the past six weeks. Phil talked about it, O’Neill wanted it, yet we are three days way from 2013 with nothing in writing.

Tree - so, where do you think the problem lies? Is this the infamous "PNG time" where nothing gets done on time? Or, do you think they are at some sort of impasse regarding the "additional 27.5%"? Of course, Christmas/New Year's for politicians is built-in vacation time...

Hey John,

I didn't know there was any problem.  If you know of one please tell.    All indications are that this is a big process and it is being worked through.

If I had to identify a 'poblem' it would be there are 6 bidders minimal in the mix still.  Gotta weed them out through the bid process.  That means the $/M will rise.  Could well be awaiting the new GLJ certified report for E/A is the clincher.  BOD's of Co's trust their own PE's but will still want 3rd party verification.  That comes out in Feb/March historically.  Maybe that GLJ will trigger take-over attempt.  Who knows for sure.




RE: Open Letter to RDS, CVX, TOT and XOM - Gator - 12-27-2012

"I didn't know there was any problem." Other than the stock being one bad day away from being down three consecutive years, no problems.

I think this board and every member should also avoid using the terms "buy out" and "take over" until the stock price is at least $70. Talk of $400+ just look silly when we in the $50's.


RE: Open Letter to RDS, CVX, TOT and XOM - johnwgrant - 12-27-2012

'Tree' pid='15225' datel Wrote:

'johnwgrant' pid='15224' datel Wrote:

'Gator' pid='15222' datel Wrote:Tree, As much as I respect what you say, your second point is incorrect. InterOil does not have a signed modified project agreement in hand. That has been part of the problem for the past six weeks. Phil talked about it, O’Neill wanted it, yet we are three days way from 2013 with nothing in writing.

Tree - so, where do you think the problem lies? Is this the infamous "PNG time" where nothing gets done on time? Or, do you think they are at some sort of impasse regarding the "additional 27.5%"? Of course, Christmas/New Year's for politicians is built-in vacation time...

Hey John,

I didn't know there was any problem.  If you know of one please tell.    All indications are that this is a big process and it is being worked through.

If I had to identify a 'poblem' it would be there are 6 bidders minimal in the mix still.  Gotta weed them out through the bid process.  That means the $/M will rise.  Could well be awaiting the new GLJ certified report for E/A is the clincher.  BOD's of Co's trust their own PE's but will still want 3rd party verification.  That comes out in Feb/March historically.  Maybe that GLJ will trigger take-over attempt.  Who knows for sure.

I don't know of a problem - but, my understanding was that InterOil would first finalize the Project Agreement with the PNG gov't (including the option for an additional percentage (up to 27.5%)).   The Project Agreement would still be "general" at this point - ie, it would not necessarily pinpoint who the Sell-Down partner would be, nor, the exact nature of the LNG plant itself.  (However, the 3.8 mtpa minimum size and Gulf Province location would be specifically approved).

Only once InterOil has this signed (and approved by the NEC) Project Agreement would InterOil then hammer out the details with the bidders/other stakeholders.  This would take several weeks.

So, if my take is correct, I am still waiting for the first shoe to drop -- ie, the announcement of a definitive Project Agreement with the PNG gov't.  I would expect the stock price to accelerate to the upside when this announcement occurs.  (although, I still can't understand the depressed stock price right now.)




RE: Open Letter to RDS, CVX, TOT and XOM - sfiaes - 12-27-2012

"I didn't know there was any problem."

Here's the problem Tree, the stock is at $55 and sucking wind.

"Could well be awaiting the new GLJ certified report for E/A is the clincher....That comes out in Feb/March historically."

I hope that's not coming from "insiders". It appears to me that management doesn't have the time or money to drill more wells and prove out the resource before they do a deal.