The waiting game - Justin94360 - 10-28-2013

The waiting game

AN OUTCOME to the various commercialisation talks over InterOil’s Elk-Antelope discoveries has proven to be quite elusive so far.

There was considerable industry hope that ExxonMobil would land a deal to acquire 4.6 trillion cubic feet of gas from the Elk-Antelope field to underpin a third train expansion of the PNG LNG project.

The PNG LNG operator and InterOil entered into exclusive negotiations in late May with Prime Minister Peter O’Neill telling Parliament they would last for up to 60 days. Two months rolled on without any breakthrough. A significant snag seemed to have emerged in early August with Petroleum Minister William Duma siding with Gulf Province parliamentarians over their wish to keep Elk-Antelope gas processing in the province. It clashed with Exxon’s preferred option to pipe about half of this field’s gas to its PNG LNG facilities in the Southern Highlands region. PNGIndustryNews.net broke the news later that month that the exclusivity arrangements for the talks between Exxon and InterOil had lapsed. It allowed InterOil to restart talks with other candidates. Supermajors Total SA and Royal Dutch Shell are believed to have previously submitted bids. Not long after, an industry source told PNGIndustryNews.net that it was a “fairly open race”. Further updates since have proven hard to come by, however, ExxonMobil’s PNG subsidiary Esso Highlands appears to still be on the negotiating table. In an interview with ABC Radio Australia in September, Esso Highlands managing director Peter Graham discussed the potential for Elk-Antelope to host enough gas to provide “at least” one additional PNG LNG train. The field has 9.07Tcf of initial recoverable sales gas, according to GLJ Petroleum Consultant’s best-case estimate and the PNG LNG chief hinted that further drilling was required. “I think before any expansion project goes forward based on any resource, there is going to need to be a definition of what reserves are available and that’s true as well for the Elk-Antelope resource,” Graham said on air. While Exxon has previously revealed it has enough space for five trains at PNG LNG’s plant site near Port Moresby, Graham said a phased expansion of “one train at a time” was most likely. “We are optimistic and we have a very active program underway to move expansion plans forward as fast as we practically can,” he told Radio Australia. While he told the program there were additional gas prospects in three provinces, only InterOil’s Elk-Antelope field in Gulf province was discussed on air. Later that month O’Neill told the PNG Advantage conference that the government’s challenge was to work with gas sector investors and developers to bring new projects to the development stage “as soon as possible”. How long it could take for InterOil to bring in a strategic partner to the Elk-Antelope field remains unknown. But there does seem to be a time limit in place. On August 1 Duma warned that InterOil had 180 days to honour the commitments of its 2009 LNG project agreement with the government with those since-shelved plans based on the Elk-Antelope field. Published in the October 2013 PNG Report magazine




RE: The waiting game - jft310 - 10-28-2013

Poor Blair, he sees others with news and he has no news and thus this article. Since Blair was the man behind he use of the word "dead" in regards the Exxon negotiations he would be the last person to get an update from anyone. Why?? Cause the negotiations were not dead but were on going.He was duped by the shorts. Possibly involved with the shorts in some way. Even The National has IOC news but not Blair. There is a price to pay for over stating facts to help some and hurt others. Making it up without vetted facts is expensive Blair.


RE: The waiting game - Palm - 10-28-2013

Looks like he was not invited to the cocktail party and was left with no scoop.


RE: The waiting game - j4j - 10-28-2013

'Palm' pid='30380' dateline='<a href="tel:1382960 Wrote:Looks like he was not invited to the cocktail party and was left with no scoop.
if you look back, I think tree posted this article about 3 weeks ago.  It doesn't appear to have anything to do with the events of the last week.




RE: The waiting game - jft310 - 10-28-2013

I actually think Blair is being used again to create uncertainty and allow some shorts who are using him to cover their short. Poor Blair just doesn't get it. When a reporter loses their sources and they refuse to give him updates because of past botches well its a matter of time till the newspaper boss finds someone with sources who can do the job right. You did this to yourself Blair!!And you are doing it again




RE: The waiting game - Palm - 10-28-2013

This is the best BP and PNGIndustry News can do; rerun an old worthless article? Well done boys.


RE: The waiting game - sageo - 10-29-2013

Guys- While we wait, would someone please refresh my (old) memory about something.....I believe our larger rig is still located at the Elk 3 drill site . I know one of our board members told me some time back where the other rig was,but I just can't recall. Would appreciate someone give me that info again and this time I will make a note, TIA.




RE: The waiting game - petrengr1 - 10-29-2013

Sageo: From IOC's second quarter MD&A:

"On May 15, 2013, a decision was made to warm stack Rig-3 at Elk-3, which means that although the rig is idle, it remains operational and can be quickly deployed."

"Rig-2 was demobilized from the Antelope-3 well location back to Herd Base for consolidation of camp locations, further sand blasting and repainting of rig components."




RE: The waiting game - Getitrt2 - 10-29-2013

I understand Rig 2 is pending deployment to Wahoo.