![]() |
|
slide highlights - Printable Version +- ShareholdersUnite Forums (http://shareholdersunite.com/mybb) +-- Forum: Companies (http://shareholdersunite.com/mybb/forumdisplay.php?fid=1) +--- Forum: InterOil Forum (http://shareholdersunite.com/mybb/forumdisplay.php?fid=4) +--- Thread: slide highlights (/showthread.php?tid=7634) |
slide highlights - jft310 - 11-14-2014
Raptor-1
• 12km west of Elk-Antelope field
• Ownership*
• InterOil 65.2%
• Pacific Rubiales 12.9%
• Minorities 21.9%
As of November 14, 2014
• Drilled to 4,032m below rig rotary table
– 16 –
• Raptor-1 flared gas and condensate
• On November 14, 2014, notified the
Department of Petroleum and Energy
of the Raptor-1 discovery
• Planning to appraise accumulation
through additional seismic, appraisal
drilling and comprehensive testing in
2015
RE: slide highlights - jft310 - 11-14-2014
Bobcat-1
• 30km north-west of Elk-Antelope field
• Ownership*
• InterOil 78.1%
• Minorities 21.9%
As of November 14, 2014
• Drilled to target depth of 3,208m
Bobcat-1 (PPL476)
Bobcat-1
– 17 –
• Drilled to target depth of 3,208m
• Intersected around 320m of Kapau
limestone
• Currently wireline logging
RE: slide highlights - jft310 - 11-14-2014 Wahoo-1 • 165km north-west of Port Moresby • Ownership* • InterOil 78.1% • Minorities 21.9% • Well suspended on July 14, 2014 following safety concerns over high pressures As of November 14, 2014 Wahoo-1 (PPL474): Plan to resume drilling in 2015 Wahoo-1 – 18 – As of November 14, 2014 • Current review of options covers well engineering, mud weight and type, casing design Resumption of drilling planned for 2015 • Rig retained, ready to resume • Timing driven by: Safety Well design Procurement e.g. suitable wellhead Finalization of drilling sequence RE: slide highlights - jft310 - 11-14-2014 2014 Murua Seismic Survey • Start: Q4 2014 • End: Q3 2015 (3 Phases) • Target: Gravity anomalies • Program Length: 465km • Potential to be significantly expanded Looking ahead: Seismic & AGG program – 19 – Airborne Gravity Gradiometry (AGG) Survey • Coverage of exploration acreage with AGG • Capacity to dynamically infill to 250m over key targets • Fixed wing and rotary RE: slide highlights - will2bgreat - 11-14-2014
'jft310' pid='51932' datel Wrote: Would like to know flow rates, pressures, choke size, and condensate amounts. In addition, an estimated total depth of the limestone would be helpful. Hopefully this will come out in the call. Good luck longs. RE: slide highlights - jft310 - 11-14-2014 At Bobcat 320 meters of limestone (reservoir rock ) is 1049 feet. RE: slide highlights - ArtM72 - 11-14-2014
'jft310' pid='51937' datel Wrote: That was about the ONLY number that came out of the call other than Callio's quote from PRE that they now believe Raptor could be 10Ts. |