Raptor-1
• 12km west of Elk-Antelope field
• Ownership*
• InterOil 65.2%
• Pacific Rubiales 12.9%
• Minorities 21.9%
As of November 14, 2014
• Drilled to 4,032m below rig rotary table
– 16 –
• Raptor-1 flared gas and condensate
• On November 14, 2014, notified the
Department of Petroleum and Energy
of the Raptor-1 discovery
• Planning to appraise accumulation
through additional seismic, appraisal
drilling and comprehensive testing in
2015



RE: slide highlights - jft310 - 11-14-2014

Bobcat-1
• 30km north-west of Elk-Antelope field
• Ownership*
• InterOil 78.1%
• Minorities 21.9%
As of November 14, 2014
• Drilled to target depth of 3,208m
Bobcat-1 (PPL476)
Bobcat-1
– 17 –
• Drilled to target depth of 3,208m
• Intersected around 320m of Kapau
limestone
• Currently wireline logging



RE: slide highlights - jft310 - 11-14-2014

Wahoo-1
• 165km north-west of Port Moresby
• Ownership*
• InterOil 78.1%
• Minorities 21.9%
• Well suspended on July 14, 2014 following safety
concerns over high pressures
As of November 14, 2014
Wahoo-1 (PPL474): Plan to resume drilling in 2015
Wahoo-1
– 18 –
As of November 14, 2014
• Current review of options covers well engineering,
mud weight and type, casing design
Resumption of drilling planned for 2015
• Rig retained, ready to resume
• Timing driven by:
 Safety
 Well design
 Procurement e.g. suitable wellhead
 Finalization of drilling sequence


RE: slide highlights - jft310 - 11-14-2014

2014 Murua Seismic Survey
• Start: Q4 2014
• End: Q3 2015 (3 Phases)
• Target: Gravity anomalies
• Program Length: 465km
• Potential to be significantly expanded
Looking ahead: Seismic & AGG program
– 19 –
Airborne Gravity Gradiometry (AGG)
Survey
• Coverage of exploration acreage with
AGG
• Capacity to dynamically infill to 250m
over key targets
• Fixed wing and rotary


RE: slide highlights - will2bgreat - 11-14-2014

'jft310' pid='51932' datel Wrote:

Raptor-1
• 12km west of Elk-Antelope field
• Ownership*
• InterOil 65.2%
• Pacific Rubiales 12.9%
• Minorities 21.9%
As of November 14, 2014
• Drilled to 4,032m below rig rotary table
– 16 –
• Raptor-1 flared gas and condensate
• On November 14, 2014, notified the
Department of Petroleum and Energy
of the Raptor-1 discovery
• Planning to appraise accumulation
through additional seismic, appraisal
drilling and comprehensive testing in
2015

Would like to know flow rates, pressures, choke size, and condensate amounts.  In addition, an estimated total depth of the limestone would be helpful.  Hopefully this will come out in the call.

Good luck longs.




RE: slide highlights - jft310 - 11-14-2014

At Bobcat 320 meters of limestone (reservoir rock ) is 1049 feet.




RE: slide highlights - ArtM72 - 11-14-2014

'jft310' pid='51937' datel Wrote:

At Bobcat 320 meters of limestone (reservoir rock ) is 1049 feet.

That was about the ONLY number that came out of the call other than Callio's quote from PRE that they now believe Raptor could be 10Ts.