The Learning Curve - petrengr1 - 11-24-2014
Why has it taken longer to drill Wahoo-1, Bobcat-1 and Raptor-1 than Dr. Hession originally estimated? Very simple. The new Dream Team got in over their head and didn’t know what they were doing. I don’t fault them too much for this as everyone has to start their learning curve somewhere and sometime. I think the main problem is we were long on Exploration expertise (Holland, Brown, Hession and probably others) and short on Drilling expertise. We jumped on three very difficult wells at the same time which this organization had never done before. The Orubadi shale was much harder to drill than anticipated and the over pressuring was much higher than expected. In hindsight we were deficient in the following places:
1. Mud Program Design
2. Drilling Program Design
3. Casing Program Design
4. Equipment required...Blowout preventers, well head, Rigs
5. Drilling Personnel with the required expertise.
I believe the team originally knew these wells would encounter over pressured shale and probably over pressured reservoirs. What they did not understand is the extent of the over pressuring and difficulty they would encounter in drilling these highly reactive over pressured shales. I now believe the pressures they are encountering are much higher than I had previously thought. So they have had to learn what was required and make the necessary adjustments in the five above categories. I give credit to Dr. Hession for making the necessary adjustments and hope he has covered all of the bases.
How can I make these criticisms? Well it is primarily based on what I and you can see.
1. All three wells took much longer to drill than anticipated. In the case of Wahoo-1 the well was suspended before reaching the top of the pay zone.
2. All three wells failed to reach the top of the pay zone with the desired casing size. This means they felt they needed to set casing more often than called for in their original drilling plan. Probably due to a less than optimum drilling mud program to control the reactive over pressured shale.
3. I think the drilling of all three wells commenced with more or less conventional mud systems which were inadequate in controlling the swelling over pressured shale. These mud systems have a very high viscosity when you are require to raise the mud weight to high levels. All of these wells may be different but I am coming to the conclusion that all of these deeper exploration wells (and the shallower Wahoo-1 as well) may have pressures that are approaching the frac gradient of 1 psi/ft. If we guess the pressure is getting up to 0.95 psi/ft that would require a mud weight of 18.2 lb/gal. The viscosity of a conventional mud system with this weight would be very high and that would cause high annular pressure losses particularly in small holes after you have already used up all of your casing sizes before reaching the pay zone. I believe this is what happened at Wahoo-1. The industry has developed modern mud systems that are capable of inhibiting the swelling of these reactive over pressured shales at high mud weight and low viscosity. You can read about some of these systems at http://tinyurl.com/k5h7rsu . These kcl-polymer-glycol muds seem to be the mud system of choice for this type of problem. Oil based mud systems were previously used to keep from hydrating these shales but the oil based systems are not environmentally friendly whereas these new kcl-polymer-glycol systems are more environmentally friendly while providing better shale inhibition and allowing high mud weight at a much lower viscosity. I believe IOC has now learned this lesson and this type mud will be used in future wells where we are drilling through the over pressured Orubadi shale.
4. IOC has mentioned that they encountered pressure higher than expected at Wahoo-1 and suspended the well which they now say will be re-drilled in 2015. It is my understanding that they will be up grading the pressure rating of the Blowout Preventer and they have mentioned they are waiting on a long lead time item such as a proper well head. Though they refused to say if they would use the same well bore or start a new well from the surface I believe if they are getting a new well head they will be starting a new well from the surface. This will give them the option of increasing the size and working pressure of the well head. This will also allow them to run more strings (sizes) of casing if required. The other possibility would be to swich out the mud system to the kcl-polymer-glycol system to reduce the friction losses in the annulus and continue drilling the existing well to the top of the Limestone pay zone.
5. Dr. Hession has made a special point on the last presentation http://tinyurl.com/l379o9t page 12 that the personnel in the Operations Team has been upgraded with the hiring of:
“New VP Drilling – Tom Junker (Apache, ConocoPhillips)
New GM Development – Phil Ryles (Santos, Woodside)
New GM Portfolio and Assurance – Mark Graham (Schlumberger, Shell, TRACS)
New GM Supply – Des Drury (Bechtel, Chevron, Shell, Woodside)”
I hope he has also made sure that we have adequate number of qualified drilling engineers and full time well site supervisors for the mud system and pressure control.
Page 12 of the presentation also mentions:
“Strengthened service providers Performance improvement
World-class drilling consultants advising on improving drilling efficiency
Using High Arctic Energy Services (HAES) – experienced heli-rig contractors
Strengthened supply and procurement
InterOil currently manages 4 rigs (owns 2, leases 2)
Moving to a leasing model (industry standard)
Two new rigs expected in 2015”
So, let’s give them credit for learning as we go and making the necessary adjustments to see that future wells are drilled more quickly and efficiently.
Now a few comments and a little speculation about what we might be looking at for reservoir pressure at the three explorations wells, Wahoo-1, Raptor-1 and Bobcat-1.
They have never given us a depth reached at Wahoo-1 but they did say they had gas entering the hole above the pay zone which is when they suspended the well. If we assume they did not want to exceed the pressure rating of the their 5,000 psi blow out preventer we might conclude that they thought they might be about to drill into a reservoir that might have pressure higher than 5,000 psi. With a mud weight of 18.2 lb/gal or a pressure gradient of 0.95 psi/ft the depth of the well might be only about 5,300 feet deep.
I have previously given you an estimated reservoir pressure for Raptor-1 of 7,250 psi based on a conservative mud weight of 11 lb/gal. At the time I told you the pressure might well be higher. What would the pressure be if the reservoir required a mud weight of 18.2 lb/gal (0.946 psi/ft)? With the depth of the mid-point of the open hole at Raptor-1 now being reported to be 12,688 ft. , the reservoir pressure could be as high as 12,000 psi. Remember the higher the pressure the more gas the reservoir will contain for equal porosity and rock volume. If the pressure is 12,000 psi that would be about 3.2 times higher than Antelope.
Yes, that seems a little high so let’s just say that might be the upper limit. If it is over 10,000 psi that might explain some of the delay as they might have needed to up grade the Blow Out Preventer here also from 10,000 psi to 15,000 psi.
And what about Bobcat? Well they have now reported that the well was drilled to a depth of 3,208 meters (10,525 feet). A mud weight of 18.2 lb/gal (gradient of 0.946 psi/ft) would give us a reservoir pressure of 9957 psi. Let’s just say 10,000 psi for estimating purposes. Let’s hope the reservoir also contains hydrocarbons in a formation with porosity and permeability.
If all three of these wells discovery gas with pressure in the range of 0.95 psi/ft it will have significant positive implications for the amount of gas reserves these fields will contain. We know we have gas/condensate at Raptor-1 and we know we had gas entering the well bore above the pay zone at Wahoo-1 where they were worried about high pressure. We await the results of logging and perhaps testing at Bobcat-1. It would be nice if they would reveal an actual reservoir pressure or mud weight to confirm my theory.
What might be the logic of thinking all of these reservoirs might have pressure as high as 95% of the frac gradient? Well we have a lot of gas and oil seeps all over this tectonically active Eastern PNG Basin. When these traps fill to their limit and the aquifer is cut off from the regional aquifer the pressure builds to the frac limit and the gas or oil comes to the surface. With all of the faulting and folding going on the limestone is broken up into many fault blocks and sealed off from the regional aquifer but the tectonic forces keep squeezing the blocks and increasing the pressure. The upper limit will be the frac gradient which is about 1 psi/ft. At that point the balloon ruptures and let’s out a little burp which results in a gas seep at the surface somewhere and the pressure in the reservoir drops back to a little below the frac gradient, say maybe about 18.2 lb/gas or 0. 946 psi/ft.
BEWARE of all of the above as it was written by an old obsolete engineer on steroids who may not be thinking clearly. The old dummy once had the audacity to suggest that all three of these wells would be discoveries while the experts were/are saying the ratio of discoveries to dry holes will be 1/10 or 1/20. Some experts even said the old geezer’s suggestion was ludicrous. So beware, beware, beware!!!!
RE: The Learning Curve - Putncalls - 11-24-2014
Well Pet,
I woul say that with the 1/10 number the odds of you being correct used to be 1 in 1,000. Now the odd are 1/100.
RE: The Learning Curve - ebster123 - 11-24-2014
Pet, in the land of the blind the one eye'd man is king...thank you, T
RE: The Learning Curve - Stavros - 11-24-2014
Hey you old geezer
QUOTE The old dummy once had the audacity to suggest that all three of these wells would be discoveries while the experts were/are saying the ratio of discoveries to dry holes will be 1/10 or 1/20. Some experts even said the old geezer’s suggestion was ludicrous. So beware, beware, beware!!!! END QUOTE
I guess you don't understand Millenial Math. 1 out of 20 really means 100% success at finding some hydrocarbons in all the wells.
3 out of 3 means "Fill up the Cement Pond Granny cuz we're ready for the Big Show"
How Millenial are you Pet? I scored 40.
http://www.pewresearch.org/quiz/how-millennial-are-you/
RE: The Learning Curve - geologydude - 11-24-2014
'petrengr1' pid='52325' datel Wrote:
Why has it taken longer to drill Wahoo-1, Bobcat-1 and Raptor-1 than Dr. Hession originally estimated? Very simple. The new Dream Team got in over their head and didn’t know what they were doing. I don’t fault them too much for this as everyone has to start their learning curve somewhere and sometime. I think the main problem is we were long on Exploration expertise (Holland, Brown, Hession and probably others) and short on Drilling expertise. We jumped on three very difficult wells at the same time which this organization had never done before. The Orubadi shale was much harder to drill than anticipated and the over pressuring was much higher than expected. In hindsight we were deficient in the following places:
1. Mud Program Design
2. Drilling Program Design
3. Casing Program Design
4. Equipment required...Blowout preventers, well head, Rigs
5. Drilling Personnel with the required expertise.
I believe the team originally knew these wells would encounter over pressured shale and probably over pressured reservoirs. What they did not understand is the extent of the over pressuring and difficulty they would encounter in drilling these highly reactive over pressured shales. I now believe the pressures they are encountering are much higher than I had previously thought. So they have had to learn what was required and make the necessary adjustments in the five above categories. I give credit to Dr. Hession for making the necessary adjustments and hope he has covered all of the bases.
How can I make these criticisms? Well it is primarily based on what I and you can see.
1. All three wells took much longer to drill than anticipated. In the case of Wahoo-1 the well was suspended before reaching the top of the pay zone.
2. All three wells failed to reach the top of the pay zone with the desired casing size. This means they felt they needed to set casing more often than called for in their original drilling plan. Probably due to a less than optimum drilling mud program to control the reactive over pressured shale.
3. I think the drilling of all three wells commenced with more or less conventional mud systems which were inadequate in controlling the swelling over pressured shale. These mud systems have a very high viscosity when you are require to raise the mud weight to high levels. All of these wells may be different but I am coming to the conclusion that all of these deeper exploration wells (and the shallower Wahoo-1 as well) may have pressures that are approaching the frac gradient of 1 psi/ft. If we guess the pressure is getting up to 0.95 psi/ft that would require a mud weight of 18.2 lb/gal. The viscosity of a conventional mud system with this weight would be very high and that would cause high annular pressure losses particularly in small holes after you have already used up all of your casing sizes before reaching the pay zone. I believe this is what happened at Wahoo-1. The industry has developed modern mud systems that are capable of inhibiting the swelling of these reactive over pressured shales at high mud weight and low viscosity. You can read about some of these systems at http://tinyurl.com/k5h7rsu . These kcl-polymer-glycol muds seem to be the mud system of choice for this type of problem. Oil based mud systems were previously used to keep from hydrating these shales but the oil based systems are not environmentally friendly whereas these new kcl-polymer-glycol systems are more environmentally friendly while providing better shale inhibition and allowing high mud weight at a much lower viscosity. I believe IOC has now learned this lesson and this type mud will be used in future wells where we are drilling through the over pressured Orubadi shale.
4. IOC has mentioned that they encountered pressure higher than expected at Wahoo-1 and suspended the well which they now say will be re-drilled in 2015. It is my understanding that they will be up grading the pressure rating of the Blowout Preventer and they have mentioned they are waiting on a long lead time item such as a proper well head. Though they refused to say if they would use the same well bore or start a new well from the surface I believe if they are getting a new well head they will be starting a new well from the surface. This will give them the option of increasing the size and working pressure of the well head. This will also allow them to run more strings (sizes) of casing if required. The other possibility would be to swich out the mud system to the kcl-polymer-glycol system to reduce the friction losses in the annulus and continue drilling the existing well to the top of the Limestone pay zone.
5. Dr. Hession has made a special point on the last presentation http://tinyurl.com/l379o9t page 12 that the personnel in the Operations Team has been upgraded with the hiring of:
“New VP Drilling – Tom Junker (Apache, ConocoPhillips)
New GM Development – Phil Ryles (Santos, Woodside)
New GM Portfolio and Assurance – Mark Graham (Schlumberger, Shell, TRACS)
New GM Supply – Des Drury (Bechtel, Chevron, Shell, Woodside)”
I hope he has also made sure that we have adequate number of qualified drilling engineers and full time well site supervisors for the mud system and pressure control.
Page 12 of the presentation also mentions:
“Strengthened service providers Performance improvement
World-class drilling consultants advising on improving drilling efficiency
Using High Arctic Energy Services (HAES) – experienced heli-rig contractors
Strengthened supply and procurement
InterOil currently manages 4 rigs (owns 2, leases 2)
Moving to a leasing model (industry standard)
Two new rigs expected in 2015”
So, let’s give them credit for learning as we go and making the necessary adjustments to see that future wells are drilled more quickly and efficiently.
Now a few comments and a little speculation about what we might be looking at for reservoir pressure at the three explorations wells, Wahoo-1, Raptor-1 and Bobcat-1.
They have never given us a depth reached at Wahoo-1 but they did say they had gas entering the hole above the pay zone which is when they suspended the well. If we assume they did not want to exceed the pressure rating of the their 5,000 psi blow out preventer we might conclude that they thought they might be about to drill into a reservoir that might have pressure higher than 5,000 psi. With a mud weight of 18.2 lb/gal or a pressure gradient of 0.95 psi/ft the depth of the well might be only about 5,300 feet deep.
I have previously given you an estimated reservoir pressure for Raptor-1 of 7,250 psi based on a conservative mud weight of 11 lb/gal. At the time I told you the pressure might well be higher. What would the pressure be if the reservoir required a mud weight of 18.2 lb/gal (0.946 psi/ft)? With the depth of the mid-point of the open hole at Raptor-1 now being reported to be 12,688 ft. , the reservoir pressure could be as high as 12,000 psi. Remember the higher the pressure the more gas the reservoir will contain for equal porosity and rock volume. If the pressure is 12,000 psi that would be about 3.2 times higher than Antelope.
Yes, that seems a little high so let’s just say that might be the upper limit. If it is over 10,000 psi that might explain some of the delay as they might have needed to up grade the Blow Out Preventer here also from 10,000 psi to 15,000 psi.
And what about Bobcat? Well they have now reported that the well was drilled to a depth of 3,208 meters (10,525 feet). A mud weight of 18.2 lb/gal (gradient of 0.946 psi/ft) would give us a reservoir pressure of 9957 psi. Let’s just say 10,000 psi for estimating purposes. Let’s hope the reservoir also contains hydrocarbons in a formation with porosity and permeability.
If all three of these wells discovery gas with pressure in the range of 0.95 psi/ft it will have significant positive implications for the amount of gas reserves these fields will contain. We know we have gas/condensate at Raptor-1 and we know we had gas entering the well bore above the pay zone at Wahoo-1 where they were worried about high pressure. We await the results of logging and perhaps testing at Bobcat-1. It would be nice if they would reveal an actual reservoir pressure or mud weight to confirm my theory.
What might be the logic of thinking all of these reservoirs might have pressure as high as 95% of the frac gradient? Well we have a lot of gas and oil seeps all over this tectonically active Eastern PNG Basin. When these traps fill to their limit and the aquifer is cut off from the regional aquifer the pressure builds to the frac limit and the gas or oil comes to the surface. With all of the faulting and folding going on the limestone is broken up into many fault blocks and sealed off from the regional aquifer but the tectonic forces keep squeezing the blocks and increasing the pressure. The upper limit will be the frac gradient which is about 1 psi/ft. At that point the balloon ruptures and let’s out a little burp which results in a gas seep at the surface somewhere and the pressure in the reservoir drops back to a little below the frac gradient, say maybe about 18.2 lb/gas or 0. 946 psi/ft.
BEWARE of all of the above as it was written by an old obsolete engineer on steroids who may not be thinking clearly. The old dummy once had the audacity to suggest that all three of these wells would be discoveries while the experts were/are saying the ratio of discoveries to dry holes will be 1/10 or 1/20. Some experts even said the old geezer’s suggestion was ludicrous. So beware, beware, beware!!!!
Thanks for the analysis, Pet. I believe all three will be commercial hits as well. Indoreservoir has been proven wrong with all his gloom and doom predictions. Full steam ahead!
RE: The Learning Curve - petrengr1 - 11-24-2014
'Putncalls' pid='52329' datel Wrote:Well Pet, I woul say that with the 1/10 number the odds of you being correct used to be 1 in 1,000. Now the odd are 1/100.
Thanks for that vote of confidence. I appreicate your strong support.
RE: The Learning Curve - admin - 11-25-2014
["Thanks for the analysis, Pet. I believe all three will be commercial hits as well. Indoreservoir has been proven wrong with all his gloom and doom predictions. Full steam ahead!"]
From what I remember (which might not be entirely accurate), Indoreservoir didn't make any specific predictions but cited the literature on the odds. In fact, Hession did something similar. Odds can be beaten (but, needless to say, so can predictions).
RE: The Learning Curve - calaban48 - 11-25-2014
I remember Jed Clampett`s See-Ment pond ... Waiting patiently.
RE: The Learning Curve - Getitrt2 - 11-25-2014
'admin' pid='52340' datel Wrote:["Thanks for the analysis, Pet. I believe all three will be commercial hits as well. Indoreservoir has been proven wrong with all his gloom and doom predictions. Full steam ahead!"] From what I remember (which might not be entirely accurate), Indoreservoir didn't make any specific predictions but cited the literature on the odds. In fact, Hession did something similar. Odds can be beaten (but, needless to say, so can predictions).
There was at least a strong implication that the odds were poor and there was a high probability of failure. Why cite data of that sort unless you think it applies to the situation being discussed? The data should have been accompanied by evaluation of the case at hand and any differences that might change the global odds. Hession and Brown did that to at least some extent.
RE: The Learning Curve - Getitrt2 - 11-25-2014
Pet, I understand a lot of what you're saying, but there is apparently at least some over my head. If Raptor was even higher pressure than Wahoo and they were able to upgrade the blowout preventer and complete the well, why not also at Wahoo? How was Wahoo worse? Maybe I'm not understanding the different aspect of the well head, maybe the rig or the well engineering or crew.
|