How to monetize our gas?? - Printable Version +- ShareholdersUnite Forums (http://shareholdersunite.com/mybb) +-- Forum: Companies (http://shareholdersunite.com/mybb/forumdisplay.php?fid=1) +--- Forum: InterOil Forum (http://shareholdersunite.com/mybb/forumdisplay.php?fid=4) +--- Thread: How to monetize our gas?? (/showthread.php?tid=8773) |
How to monetize our gas?? - jft310 - 06-30-2015 How to monetize our gas finds ?? The question starts with how much gas do we have to monetize.??? Per Interoil June 9 presention slide 27. Estimates from a certified reservoir evaluator. Elk/Antelope a 2 train development without Antelope South Wahoo 3.5 TCFE Antelope South 5.5 TCFE Raptor 5.5 TCFE Bobcat 1.5 TCFE Triceratops 1.0 TCFE With 35 additional leads some multi TCFE Or 17 TCFE identified plus Elk/Antelope plus leads. Heres how Cheniere Energy monetized it's bought gas. 6 trains staggered start Sabine Pass Liquefaction, LLC, a subsidiary of Cheniere Energy Partners, L.P. (Cheniere Partners), is developing natural gas liquefaction facilities at the Sabine Pass LNG receiving terminal located in Cameron Parish, Louisiana adjacent to the existing regasification facilities. The Sabine Pass site can readily accommodate up to six liquefaction trains capable of processing over 3.5 Bcf/d of natural gas. The production capacity of each LNG train is being designed for approximately 4.5 mtpa. The 1000+ acre Sabine Pass site is strategically situated to provide LNG export services given its large acreage position, proximity to unconventional gas plays in Louisiana and Texas, its interconnections with multiple interstate and intrastate pipeline systems, and its premier marine access less than 4 miles from the Gulf Coast. The trains are being developed in three stages, with stages including Trains 1&2, Trains 3&4 and Trains 5&6. Cheniere estimates that construction of the liquefaction capacity is competitive due to expansion economics, since the Sabine Pass LNG terminal already has many of the facilities required for an export terminal. Sabine Pass Liquefaction will have access to the existing infrastructure, including five storage tanks and two berths at the Sabine Pass terminal, as well as Cheniere Partner’s 94-mile Creole Trail Pipeline, which is being reconfigured to reverse the flow of natural gas, making it a bi-directional pipeline Construction commenced on Trains 1&2 in August 2012. Construction commenced on Trains 3&4 in May 2013. The first LNG train is expected to produce LNG in late 2015, with the remaining three LNG trains being completed on a 6-9 months staggered basis thereafter.
For the first four LNG trains, 16 of the 18 mtpa has been contracted to third party, foundation customers on a long-term FOB basis under sale and purchase agreements (SPAs). Foundation customers include BG Group, Gas Natural Fenosa, KOGAS and GAIL. Train 5 has been contracted with foundation customers Total and Centrica. Any excess capacity not sold under long-term SPAs to foundation customers is available for Cheniere Marketing to purchase as described under its SPA. Services under the SPAs include procuring the natural gas, liquefying the natural gas and loading LNG onto the customer’s vessels.
Arun started with 3 LNG trains see below
Construction of the Arun LNG processing facilities, which initially consisted of 3 LNG trains, was set in motion in late 1974 by Bechtel Inc., as the main contractor. Mobil Oil Indonesia Inc., as Pertamina's production sharing contractor, discovered, developed and presently operates the Arun gas field which provides the entire feed stock for the Arun LNG plant.
Sabine Pass Liquefaction Aerial view
RE: How to monetize our gas?? - jft310 - 07-03-2015 Industry norm is a relative term , there are few places in the world with such a large concentrated gas asset . The question is what is the norm for assets with this size asset???Not a non related question of what the average LNG project starts with , if they had our assets as an average would they start with more than 2 trains ?? Arun started with 3 trains at 3.5 mtpa later expanded to 4.5 mtpa and then 3 more trains were added. Why look at Arun because that's the reference GLJ used for describing Antelope . When sizing one must include what's at Antelope South . Per a certified Reservoir engineer expect 5.5 T's. Add that number to Antelope because that gas gets developed with Antelope gas . Further look at Cheniere Energy who started with 2 trains and staggered started 2 more trains less than a year later . |