Drilling underway at Ant 4 ST1 - Palm - 08-31-2015

Singapore and Port Moresby — InterOil Corporation (NYSE: IOC) (POMSoX: IOC) advises that the PRL-15 Joint Venture has started drilling a side-track well at the Antelope-4 site, as part of its appraisal campaign on the Elk–Antelope gas field in Papua New Guinea.

The Antelope-4 appraisal had been suspended in May 2015 at a true vertical depth sub-sea of 2,056m (6,745 feet), approximately 158m above the field gas water contact.

Well operations, which resumed on August 13, 2015, included the on-site preparation and testing of well-head equipment. Subsequently the Operator, Total E&P PNG Limited obtained approval from the PNG Department of Energy to re-enter the well.

The side-track was initiated at a measured depth of 862 meters (2,828 feet)#. As at 1530 hours (PNG time) the side-track well was drilling ahead at a depth of 895 meters (2,936 feet)#.

http://www.interoil.com/iocfiles/documents/investorrelations/newsandpressreleases/2015/2015-08-31%20Ant-4%20ST1%20re-entry%20V4.pdf




RE: Drilling underway at Ant 4 ST1 - ArtM72 - 08-31-2015

Wow ! New day with up to the minute drilling progress!


RE: Drilling underway at Ant 4 ST1 - Tusker - 08-31-2015

Good to have a drill bit spinning again. So... how low will the dolomite go?


RE: Drilling underway at Ant 4 ST1 - Thylacine-2 - 09-01-2015

Pet, are there implications to be drawn from how high the side track was initiated?


RE: Drilling underway at Ant 4 ST1 - Palm - 09-01-2015

With the ST started at 862 meters and the top of reservoir encountered at 1,911 meters it's an interesting question.


RE: Drilling underway at Ant 4 ST1 - johnwgrant - 09-01-2015

'Palm' pid='62316' datel Wrote:With the ST started at 862 meters and the top of reservoir encountered at 1,911 meters it's an interesting question.

Is it possible for them to angle enough to move the eventual intersection with the top of the reservoir a good distance away - thus giving them additional information.   Almost as if they were drilling another ANT-4 a kilometre to the south ?




RE: Drilling underway at Ant 4 ST1 - Palm - 09-01-2015

These are comments from AGM side presentation:

" Slide 11 shows the reservoir rock types we expected before drilling Antelope-4 – a good quality upper limestone followed by an excellent quality dolomite and then a lesser quality lower limestone.

But this well actually intersected dolomite from the top of the reservoir and throughout the cored interval.
Generally, the average porosity for carbonates is less than 15%.
However, we encountered dolomite with porosity as high as 25%.

The insert picture shows a thin-section about the size of a small coin taken from the Antelope-4 core, and is an excellent example of how we examine reservoir quality.
Petrologists saturated this section with a viscous blue resin that filled the holes in the rock, which allows us to measure the porosity.

The positive contribution to gas volumes from this dolomite could be considerable.

The Joint Venture has now agreed to a side-track to determine the total dolomite section in the southern flank."


RE: Drilling underway at Ant 4 ST1 - petrengr1 - 09-01-2015

'Thylacine-2' pid='62315' datel Wrote:Pet, are there implications to be drawn from how high the side track was initiated?

Thy-Yes there are implications to be drawn. Since they have elected to sidetrack at such a shallow depth it appears that they will indeed kick the well further to the south to see if the dolomite extends further in that direction. Based on the planned TD of  2,378 meters, which we got from OilSearch, it appears that we will be able to kick the well about 500 meters (½ km) to the south. Since we will be kicking the well down dip the top of the formation will be slightly lower than the 1,986 meters drill depth (1,911 meters sub sea) that we had in the original Antelope-4 vertical hole. Depending on how far they will drill below the gas/water contact it appears the we might expect the top of the formation to be at about 2,040 feet drill depth in the deviated hole.  We will be drilling about 1,517 meters (4,977 feet) of new hole.

In the original hole we expected to find about 306 meters of pay above the gas/water contact at -2,214 meters sub sea (2,292 meters drill depth). In the deviated hole we will expect the top of the formation to come in a little  deeper because the well is being kicked down dip and the pay section may be a little thicker due to the angle of the hole through the formation. As mentioned above I expect the top of the formation to come in at about 2,040 meters drill depth and the drilled thickness of the pay zone may be around 320 meters. The vertical thickness will, of course, be somewhat less. The bottom of the hole will be about ½ km south of the original hole. We can hope that all of the drilled section will be dolomite all the way to the  gas/water contact. We will not reach the southern extent of the field but this hole should give us some indication as to whether or not the dolomite extends all the way to the southern edge of the field where the top of the formation reaches the gas/water contact.

Of course we know nothing about where they set the 13 3/8” casing but based on  previous wells it appears that they have recovered the upper part of the 9 5/8” casing and milled a window in the 13 3/8” casing for the sidetrack. So they will again need to run and cement a string of  9 5/8” casing at the top of the pay zone.

Contrary to my previous suggestion that they would just sidetrack a fish in the hole below the 9 5/8” casing this more  extensive operation will take more time than the month that I previously suggested and, of course, the starting time is somewhat later. They will need to run the new string of  9 5/8” casing and, assuming that they are still using the down hole deployment valves, this will take a few days of time in addition to the longer section to be drilled. I guess we should expect at least 1 1/2 months from today (October 15) to complete the well and be ready for the next connectivity test by producing Antelope-5 and monitoring the pressure in Antelope-1 and Antelope-4. I hope they can do it sooner but we will see.




RE: Drilling underway at Ant 4 ST1 - sageo - 09-02-2015

Pet - Great to hear from you ....with your fine thoughts on Ant 4 .I believe our chances are also good on finding a stronger condensate to gas ratio at the lower levels of the side-track. That would be a nice " October helping hand" happening . Thanks for your always enlightening and educating posts.