End of 2015 - 2126 - 01-01-2016

Sometimes it's good to reflect back a bit on the past to gain a better perspective on the present and future.

On the last day of 2015, I thought that a quick year-end wrap-up might be in order:

  • Feb 10: All Arbitration claims by OSH dismissed and Total declared party to PRL 15
  • Feb 16: Antelope 5 drilling intersected reservoir 230 meters higher than expected
  • Feb 27: Total appointed operator of PRL 15
  • April 27: Ant 5 extended flow testing begins and confirms Ant 5 as having "the best reservoir thickness, quality and fracture density of all wells on the field, which signifies a world-class reservoir”
  • April 27: Ant 4 drilling suspended after intersecting a 'significant fracture system'
  • June 10: Wahoo Sidetrack 1 drilling resumes in PPL 474
  • June 15: Triceratops 3 well spudded
  • July 2: Elk/Antelope JV selects Purari River location for Central processing plant location and Caution Bay (Port Moresby) for LNG plant location
  • July 31: Total assumes operatorship of PRL 15
  • Aug 12: Wahoo ST 1 abandoned
  • Aug 31: Ant 4-Sidetrack 1 drilling begins
  • Sep 18: Triceratops 3 flow test successful
  • Sep 18: Ant 4-ST 1 intersects reservoir 36 meters higher than expected
  • Nov 5: Pacific Rubiales to withdraw from PRL 39 (Triceratops) and PPL 475 (Raptor) increasing IOC ownership to over 78% in each area
  • Nov 18: Ant 4-ST 1 Flow test confirms high quality reservoir with 182 meters dolomite and 339 meter gas column
  • Dec 24: Ant 6 well spudded

Seems like quite significant progress by all accounts over the past year and we are still on track for certification and very large interim resource payment around mid-2016, as well as final design concept and beginning of FEED around the same time.

Much good news to look forward to in 2016.

It has been a pleasure and an honor to have been part of this board this past year.

May all of you and your friends and family have a happy and successful year.




RE: End of 2015 - Martinistocks - 01-01-2016

2126 thanks for outlining the years worth of progress. A happy healthy new year to all. Martini


RE: End of 2015 - jft310 - 01-01-2016

Thank you 2126,,


RE: End of 2015 - admin - 01-01-2016

Yes, thank you, this is useful.


RE: End of 2015 - Putncalls - 01-01-2016

The Chinese economy accelerated a bit less
EU LNG imports are increasing
All of Papua's competition became un-economic (moth balled)
Contractors and materials got cheaper
Papua LNG is still on Total's drawing board
FSRUs prices have fallen to 50 cents per MCF
Coal became less desirable while LNG prices dropped (change in LNG demand TBD)
Lower oil prices are having a positive impact on the global economy


RE: End of 2015 - Kaliboo - 01-02-2016

Thanks for the nice summary.  Indeed a lot happened in 2015.  Here's to a much more prosperous year ahead.  Happy New Year and thanks everyone for the interesting and entertaining posting.

Best regards,

Kaliboo




RE: End of 2015 - petrengr1 - 01-06-2016

(01-01-2016, 03:55 AM)2126 Wrote:

Sometimes it's good to reflect back a bit on the past to gain a better perspective on the present and future.

On the last day of 2015, I thought that a quick year-end wrap-up might be in order:

  • Feb 10: All Arbitration claims by OSH dismissed and Total declared party to PRL 15
  • Feb 16: Antelope 5 drilling intersected reservoir 230 meters higher than expected
  • Feb 27: Total appointed operator of PRL 15
  • April 27: Ant 5 extended flow testing begins and confirms Ant 5 as having "the best reservoir thickness, quality and fracture density of all wells on the field, which signifies a world-class reservoir”
  • April 27: Ant 4 drilling suspended after intersecting a 'significant fracture system'
  • June 10: Wahoo Sidetrack 1 drilling resumes in PPL 474
  • June 15: Triceratops 3 well spudded
  • July 2: Elk/Antelope JV selects Purari River location for Central processing plant location and Caution Bay (Port Moresby) for LNG plant location
  • July 31: Total assumes operatorship of PRL 15
  • Aug 12: Wahoo ST 1 abandoned
  • Aug 31: Ant 4-Sidetrack 1 drilling begins
  • Sep 18: Triceratops 3 flow test successful
  • Sep 18: Ant 4-ST 1 intersects reservoir 36 meters higher than expected
  • Nov 5: Pacific Rubiales to withdraw from PRL 39 (Triceratops) and PPL 475 (Raptor) increasing IOC ownership to over 78% in each area
  • Nov 18: Ant 4-ST 1 Flow test confirms high quality reservoir with 182 meters dolomite and 339 meter gas column
  • Dec 24: Ant 6 well spudded

Seems like quite significant progress by all accounts over the past year and we are still on track for certification and very large interim resource payment around mid-2016, as well as final design concept and beginning of FEED around the same time.

Much good news to look forward to in 2016.

It has been a pleasure and an honor to have been part of this board this past year.

May all of you and your friends and family have a happy and successful year.

2126- Thanks for this update.

I have one question for you. Where did you find the information about a flow test on Antelope-4 ST-1?

Here is the latest I can find:

From Interoil:

Singapore and Port Moresby, November 18, 2015: InterOil Corporation : IOC) reported that wireline logging from the Antelope-4 sidetrack-1 well in Petroleum Retention License 15 in Papua New Guinea has confirmed a southern extension of the Elk-Antelope field’s high-quality, gas-bearing dolomite. The logs measured 182 vertical meters (597 feet) of dolomite and a vertical gross gas column of about 339 meters (1,112 feet).InterOil Chief Executive Dr Michael Hession said the field continued to surprise on the upside. “First, we intersected the top of the reservoir 36 meters (118 feet) higher than the original Antelope-4 penetration,” Dr Hession said. “Second, our interpretation of data from Antelope-4 and Antelope-5 suggests that the field-wide gas-water contact is deeper than previously interpreted. ”The PRL 15 joint venture intends to begin drilling Antelope-6 in December this year as part of the appraisal program to define the resource for the Papua LNG Project.  The joint venture is also considering an additional appraisal well on the western flank of the Antelope field that could add an incremental volume of 1 to 3 Tcfe.

From OilSearch Dec. 3, 2015

During November, the Antelope 4 ST1 well was drilled to a total depth of 2,326 metres and wireline logging was completed. Log interpretations confirm that a thick, high quality dolomite reservoir unit continues to this southern location. Due to well integrity issues, long-term production testing could not be undertaken. Preparations to plug and abandon the well are now underway. Drilling on Antelope 6 and production testing of Antelope 5 is expected to commence shortly.

The following is speculation on my part:


I believe they never tested Antelope-4 ST-1 at all. They were afraid to test the well with gas to the surface and pressure on the well due to "well integrity issues". So the  well was plugged and abandoned without testing. Hopefully they got the well properly plugged so that it will not be a safety issue in the future.

I do not understand OilSearch's comment: "production testing of Antelope-5 is expected to commence shortly". I see no reason to test Antelope-5 again until we have another well to monitor for connectivity. I believe that will be Antelope-6 where drilling is presently underway. I expect to see additional testing at Antelope-5 after completing and testing Antelope-6 in order to prove connectivity between the wells.




RE: End of 2015 - 2126 - 01-06-2016

"I have one question for you. Where did you find the information about a flow test on Antelope-4 ST-1?"

PET: You are correct. The data on Ant4 ST1 was from wireline logging. In looking back over my notes, I think I messed up when cutting and pasting info. Thanks for catching that and apologies to all for my error.

Also, thanks for all of your excellent posts over the years. They are, for me, the main reason that I follow SHU regularly. Have a great new year!