Thread Rating:
  • 4 Vote(s) - 3.25 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Friday Fact
#31
All of the reservoir engineering reports are based on recoverable gas not OGIP . The lowest P-2 number from GCA was 7.1 T's . Total pays on P-2. All the reports do not include the latest wells .
Reply



Forum Jump:


Users browsing this thread: 1 Guest(s)