Below was a Twitter Post by our eyes/ears in PNG at roughly noon local time on Monday 27 April:
Apthalie Kep
@bomenuck The PM Peter O'Neill has arrived at InterOil Camp Site(Antelope#3)..
MY TAKE:
Perhaps the torch will be lit at Ant-3 (which is at the high point of the structure). Or????
As stated in the past by IOC:
Antelope-4 successfully intersected top reservoir
- Top reservoir intersected at 1,911 meters TVDSS*
- Result reduces risk of steep-dipping southern flank
Antelope-5 drilling ahead with testing planned for Q2 2015
- Continues to drill towards TD
- Extended flow test to commence on completion of Antelope-5
- Pressure gauges at other appraisal wells will monitor reservoir interconnectivity and productivity
- Tests expected to be completed before end of 2Q 2015
Antelope-6 decision was to "drill baby drill"
- Antelope-6 to separately appraise eastern flank upside
- Expected to spud in late 2Q 2015