Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
15 min. drive from IOC lay-down area
#1

Papua LNG wil be built on the Port Moresby side of PNG LNG.

Check out the lay of the land on Google Earth.

Hard to determine yet if we are to be N or S of Porebada.

Porebada is a 15 min. drive from IOC's big-ass lay down area and a 27 min. drive from PM.

Power plants, concrete plants, housing, schools, hospitals, supply wharehouses are all right here.

At worst, our loading pier is at most, the length of PNG LNG's.

Reply



Forum Jump:


Users browsing this thread: