Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
The cheapest new build plant in the world will get built . Has something to do with the asset , adjacency to Largest LNG market in the world . Etc etc
Posts: 2,505
Threads: 219
Joined: Dec 2011
Reputation:
109
Any hints as to where this swinging BOD is being reported?
Posts: 2,505
Threads: 219
Joined: Dec 2011
Reputation:
109
the fool said
"That's right: LNG is currently responsible for about 30% of Total's upstream profits even though it's only 15% of production. In the coming years, LNG could become an even larger component than that. Its Yemen LNG facility has been down for some time because of the civil conflict; it just started loading cargoes at the Gladstone LNG facility; the Yamal LNG facility in Russia is 30% complete; and the company is in the planning stages of another LNG facility in Papua New Guinea. Hopefully, Total's projections for LNG demand are correct, because it is making a very big bet on it. "
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
Technip-led design work in full swing at Papua LNG
SHARE STORY
inShare
Contact us
11 December 2015 01:00 GMT
basis of design works, led by French services major Technip, is in full swing on the multi-billion dollar Papua liquefied natural gas project in Papua New Guinea, writes Russell Searancke.
Sources said the design work will be ongoing until the third quarter next year, at which point there could be an entry into front-end engineering and design providing there are no significant delays.
It is understood the work, being led by Technip, covers the upstream and LNG aspects of the development, which co-venturer InterOil has previously said should carry an estimated capital cost of about US$16 billion.
The basis of design will, among other things, help to inform the size of all production facilities, including the LNG plant, as well as develop the bid criteria for the FEED phase, said sources.
It could not be confirmed how many FEED packages will be offered for bidding, but sources said the upstream facilities, pipelines and LNG plant will attract some of the world’s leading contractors.
There is an understanding that the FEED contractors will have roll-over options for the prized engineering procurement and construction contracts. In early July, the Papua LNG partners made the crucial site selections for the LNG plant and upstream processing facility.
The LNG plant will be located at Caution Bay, near Port Moresby, on a site alongside ExxonMobil’s PNG LNG plant.
The upstream processing facility will be near the Purari River in Gulf Province, about 360 kilometres north-west of Port Moresby. The project partners are still busy with appraisal drilling at the Elk-Antelope fields.
They are about to spud the Antelope-6 appraisal well, and run production testing at Antelope-5.
InterOil has provided recent insight on the estimated resource sizes of three of the gas discoveries.
Saxon Palmer, InterOil’s senior vice president of exploration, told delegates at the PNG Mining and Petroleum event in Port Moresby that the Bobcat, Triceratops and Raptor discoveries together represent an estimated mid-case resource volume of 8 trillion cubic feet equivalent of gas.
Of that total, Raptor has 5.5 Tcfe, Bobcat has 1.5 Tcfe and Triceratops contains 1 Tcfe.
Click Here!
Share share with friends tip a friend print preview icon
inShare
Contact Upstream
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
For you Art . Must have missed this one .
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
Art great question you ask ..