Gas for PNG LNG Trains 3 - 5
#1

I don’t think we have the proper respect for how unbelievably complicated it is to lay a large pipeline through the mountains. I direct your attention to http://www.oilsearch.com/Media/docs/1309...169c-0.pdf slide 10 (page 5). Do you see how they are handling the large diameter pipe with the carriers running on a cable. Where is the cable attached at the bottom and the top? This is a massive operation and this is just for one small section of the pipeline. They have to move and rebuild this all along the pipeline through the mountains. The installation of these pipelines must require a huge expenditure. I can see why Exxon might be losing their “taste” for more of this kind of work it there is a cheaper alternative i.e. Elk/Antelope (actually all of PRL 15) and the other Interoil prospects near the coast and closer to their LNG Plant.

If you look at slide 5 (page 3) you can see the location of the P’nyang Field relative to the Juha and Hides Fields and the PNGLNG Plant near Port Moresby. Now look at slide 8 (page 4) and you will see that they have a 14” gas pipeline from Juha to Hides and a 32”  gas pipeline to the coast. This system was apparently set up to handle up to 3 trains before the discovery of P’nyang Field. If they ever decide to bring a large amount of gas (for trains 3 -5) from the P’nyang Field to the PNG LNG Plant the 14” pipeline from  Juha to Hides will certainly be too small and probably the 32” pipeline will be too small also. They will need to lay about 150 km of large diameter pipeline from P’nyang Field to Hides (through the mountains) in order to reach the existing 32” pipeline which itself will be too small for 4-5 trains. Would they consider doubling the pipeline capacity all the way from P’nyang Field to the PNG  LNG Plant? Another 32”+ pipeline all the way from P’nyang Field to the coast and another 34” subsea pipeline to the Plant. I doubt it. You might begin to see why it is much more economical to load trains 3-5 with gas from Elk/Antelope, Triceratops and other fields yet to be discovered in IOC’s PPL 236, PPL 237 and PPL 238 as well as PRL 15.

I believe Exxon is already convinced Elk/Antelope has sufficient gas for one train (train 3) and the additional drilling they want to do will be to increase their confidence about the amount of gas at Elk/Antelope (and all of PRL 15) before they are willing to commit for investment cost for trains 4 and 5. If the additional drilling in PRL 15 proves sufficient gas for trains 3-5 then all of the other prospects could be used for the Gulf LNG Plant i.e. Triceratops, Tuna, Wahoo etc. etc.

Reply

#2
Great post Pet, Thanks.
Reply

#3
Thanks Pet. Something I probably should know, but where is the T that Exxon put in that could be used for the IOC gas?
Reply

#4
Excellent points Pet; sure makes sense that XOM wants the most accesible, already proven and least expensive gas for at least Train 3.

Uncle T: The spur was put in near the Bluff location which is the expected site of Gulf LNG. This was confirmed to us by management at the 2012 AGM