Thread Rating:
  • 5 Vote(s) - 3.8 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Wahoo
#51
Are we talking wedgies??? Just checking
Reply

#52

Sageo wrote:
“Good am to you, sir! I realize 'off topic' from "trading volume", but if you had to make a guess( yes I understand a guess), where do you think Wahoo would be at this time? [ while I am recovering from my hip surgery,I suppose I 'm getting "restless"] . Would your "guess" be close to 4300 ', baring any unforseen delays? Hope all is well with you and yours.”

Sageo- I moved your message here so it will be on the right topic.

We have been drilling at Wahoo for about 45 days. Dr. Hession said we should expect news in late April or early May. I don’t know at what stage the drilling will be when we get the first news. Where they are at this time depends on a lot of different things i.e. 1. Have they experienced any unforeseen problems? 2. Did they find an upper zone and was it over pressured? 3. Any delays due to this being the first well drilled by Rig 3 with a new crew? 4. How many times have we set casing and installed down hole deployment valves? 5. Any problems due to over pressured formation sloughing into the hole? 6. Have we lost circulation due to drilling into a high porosity and/or fractured  over pressured reef using high mud weight? This would probably cause us to convert over to managed pressure drilling?

IOC has not even said how deep they plan to drill at Wahoo. I think they will drill to about 6,500 feet where they will run and cement a 7” liner and do all their testing inside of casing.

My guess? Yes, I think they have had time to be as deep as 4,300 feet.

Reply

#53

'petrengr1' pid='42487' datel Wrote:

Sageo wrote:
“Good am to you, sir! I realize 'off topic' from "trading volume", but if you had to make a guess( yes I understand a guess), where do you think Wahoo would be at this time? [ while I am recovering from my hip surgery,I suppose I 'm getting "restless"] . Would your "guess" be close to 4300 ', baring any unforseen delays? Hope all is well with you and yours.”

Sageo- I moved your message here so it will be on the right topic.

We have been drilling at Wahoo for about 45 days. Dr. Hession said we should expect news in late April or early May. I don’t know at what stage the drilling will be when we get the first news. Where they are at this time depends on a lot of different things i.e. 1. Have they experienced any unforeseen problems? 2. Did they find an upper zone and was it over pressured? 3. Any delays due to this being the first well drilled by Rig 3 with a new crew? 4. How many times have we set casing and installed down hole deployment valves? 5. Any problems due to over pressured formation sloughing into the hole? 6. Have we lost circulation due to drilling into a high porosity and/or fractured  over pressured reef using high mud weight? This would probably cause us to convert over to managed pressure drilling?

IOC has not even said how deep they plan to drill at Wahoo. I think they will drill to about 6,500 feet where they will run and cement a 7” liner and do all their testing inside of casing.

My guess? Yes, I think they have had time to be as deep as 4,300 feet.

Thanks Pet for your assistance with my computer (lack of ) skills.Yes, all the things you so sharply noted could determine our current drilling depth.I sure wish ioc would issue periodic drilling reports on our 3 recent wells,but I guess that would be asking too much.Good luck to you and yours. ( it was my second hip replacement....first one was 19 years ago) .....gives all you young,handsome guys something to look forward to ! Ha,ha.   [ lucky me .....I've been blessed with the same "home nurse"]

Reply

#54

'petrengr1' pid='42487' datel Wrote:

Sageo wrote:
“Good am to you, sir! I realize 'off topic' from "trading volume", but if you had to make a guess( yes I understand a guess), where do you think Wahoo would be at this time? [ while I am recovering from my hip surgery,I suppose I 'm getting "restless"] . Would your "guess" be close to 4300 ', baring any unforseen delays? Hope all is well with you and yours.”

Sageo- I moved your message here so it will be on the right topic.

We have been drilling at Wahoo for about 45 days. Dr. Hession said we should expect news in late April or early May. I don’t know at what stage the drilling will be when we get the first news. Where they are at this time depends on a lot of different things i.e. 1. Have they experienced any unforeseen problems? 2. Did they find an upper zone and was it over pressured? 3. Any delays due to this being the first well drilled by Rig 3 with a new crew? 4. How many times have we set casing and installed down hole deployment valves? 5. Any problems due to over pressured formation sloughing into the hole? 6. Have we lost circulation due to drilling into a high porosity and/or fractured  over pressured reef using high mud weight? This would probably cause us to convert over to managed pressure drilling?

IOC has not even said how deep they plan to drill at Wahoo. I think they will drill to about 6,500 feet where they will run and cement a 7” liner and do all their testing inside of casing.

My guess? Yes, I think they have had time to be as deep as 4,300 feet.

It is late April so a drilling update of any sort would be appreciated.  Hope management doesn't wait for full log report.  Throw us a bone.

Reply

#55

'oilmd9' pid='42509' datel Wrote:

'petrengr1' pid='42487' datel Wrote:

Sageo wrote:
“Good am to you, sir! I realize 'off topic' from "trading volume", but if you had to make a guess( yes I understand a guess), where do you think Wahoo would be at this time? [ while I am recovering from my hip surgery,I suppose I 'm getting "restless"] . Would your "guess" be close to 4300 ', baring any unforseen delays? Hope all is well with you and yours.”

Sageo- I moved your message here so it will be on the right topic.

We have been drilling at Wahoo for about 45 days. Dr. Hession said we should expect news in late April or early May. I don’t know at what stage the drilling will be when we get the first news. Where they are at this time depends on a lot of different things i.e. 1. Have they experienced any unforeseen problems? 2. Did they find an upper zone and was it over pressured? 3. Any delays due to this being the first well drilled by Rig 3 with a new crew? 4. How many times have we set casing and installed down hole deployment valves? 5. Any problems due to over pressured formation sloughing into the hole? 6. Have we lost circulation due to drilling into a high porosity and/or fractured  over pressured reef using high mud weight? This would probably cause us to convert over to managed pressure drilling?

IOC has not even said how deep they plan to drill at Wahoo. I think they will drill to about 6,500 feet where they will run and cement a 7” liner and do all their testing inside of casing.

My guess? Yes, I think they have had time to be as deep as 4,300 feet.

It is late April so a drilling update of any sort would be appreciated.  Hope management doesn't wait for full log report.  Throw us a bone.

oilmd- Well ,it seems that bones from our leaders are very few and  far in between.However,if we TD  Wahoo next week, it may only take "days" to set the last casing (if they do that first) before running some wire line logs. Hopefully then, we should begin to get some reports.HAGD.

Reply

#56
As we wait it might be a good time to review this post from Pet. Read all of his comments on Wahoo through the end, and on Page 5 read also Tusker's comments (Per Dave Holland Wahoo has been a much anticipated structure for many years).

Kind of helps calm the nerves; maybe better than a VO!
Reply

#57

Some weekend reading material while we wait on results from Wahoo.

Here is another couple of excerpts from the Black Bass-1 Drilling Reports:

“- Although well off the structural high, the Black Bass -1 well penetrated the Wedge Hill Limestone and logs indicated it has significant reservoir potential with log derived porosity of 15% to 18% and a gross thickness of approximately 587 feet (179 meters). The limestone formation covers a large portion of the coastal exploration licence resulting in a number of future drilling opportunities.
- Analysis of the Talama Volcanic Formation has revealed a lower porosity section with several large fracture/fault intervals with unconsolidated sands. Detailed review of the wireline logs strongly suggested that the permeability in this interval is related to fracturing and the unconsolidated zones.
- DST's were conducted over two zones: 3,100 - 5,150 feet (945 - 1,570 meters) and 5,226 - 5,383 feet (1,593 - 1,641 meters).
- Within the upper zone minimal flow of mud returns was observed during the DST, following the introduction of high mud weights to the formation.
- The DST in the deeper zone flowed formation water with gas (90% C1) cut, confirming elevated gas saturation levels in the Talama Formation. The test was terminated due to collapse of formation solids (sand, silt and gravel) into the test string. The flow was closely correlated to a fracture identified on the wireline logs.
Several features at the structural high near the Black Bass-1 well will be delineated with a seismic program to define locations for offset wells at Black Bass and should be completed while drilling is in progress in PPL237 and PPL238. The rig on Black Bass will be moved to the Triceratops well site for drilling.”

And the last report:

“Second Quarter 2005 Drilling Activities
• We spudded the first exploration well, the Black Bass – 1, of our 8-well drilling program on
April 26, 2005.
• As its primary objective, this well was programmed to test a seismic anomaly, the reservoir
potential of the Wedge Hill Limestone and the Talama Formation.
• Drilling the well has confirmed that the anomaly encountered at 3,287 feet is from a sandstone and shale sequence consistent with a fluvial system.
• Confirmation of reservoir quality sandstones and limestones was achieved, with liquid-rich natural gas in the sandstone sections, which was flared at surface during drilling.
• The Black Bass – 1 well has been plugged and abandoned. Further seismic and geological work will be necessary to determine a path forward.
• Subject to seismic and geological work, additional wells will need to be drilled to confirm the structural highs and regional extent of the reservoirs discovered.
• The results of the Black Bass – 1 have confirmed a regional play and a larger exploration opportunity along the coast for the limestone and sandstone systems, and that the oil system is positively charged with hydrocarbons.”

What can we conclude from the above reports that might help us understand what we might expect at Wahoo?

1. They thought the Wedge Hill Limestone was higher than they found it.
2. The seismic anomaly they thought was the Wedge Hill Limestone was actually a sandstone and shale sequence consistent with a fluvial system.
3.The sandstone and shale sequence was above the Wedge Hill Limestone.
4. The Wedge Hill Limestone was 587 feet thick.
5. The Wedge Hill Limestone had a log derived porosity of 15 - 18%.
6. The Talama volcanics zone was below the Wedge Hill Limestone and consisted of both a low porosity fractured zone and an unconsolidated sand.
7. The DST of the lower (Talama) zone was across the interval 5,226 - 5,383 feet, so we might conclude that the Talama was 157 feet thick.

So we could have three zones that could qualify as reservoir rock. The sands above the Wedge Hill Limestone, the Wedge Hill Limestone itself and low porosity fractured Talama zone which was on top of an unconsolidated zone of sand and gravel. The comment from the drilling report: “The test was terminated due to collapse of formation solids (sand, silt and gravel) into the test string.” is not surprising in hindsight. You can not test an unconsolidated zone in open hole without expecting it to collapse into the hole during the test. I would expect an unconsolidated zone of sand and gravel to have a porosity in excess of 30%. In order to properly test such a zone they will need to set casing through it and perforate the zone of interest and test it inside of casing. If the zone is found to be productive of either oil or gas it will probably have to be “gravel packed”  to keep the sand and gravel from entering the well bore with the produced fluid (oil or gas).

If the Wedge Hill Limestone comes in lower than expected again at Wahoo-1 it is probable that the seismic has again been misinterpreted and the anomaly they thought was the top of the limestone was actually the sand/shale sequence above the limestone. I believe over pressured shale and thick gas filled porous zones can give them some problems in interpreting the travel time through the formations. The Talama zone has been reported to have a distinct seismic signature and if it is a high porosity zone filled with gas it would probably be even more distinct.

If we do have a reef build up on the limestone platform, I would expect to see a thicker zone with better porosity than was seen at Black Bass.

I believe they will have set a string of casing (9 5/8”?) above the first productive zone. If the upper zone is over pressured they will have to use high mud weight to continue drilling. If they encounter a very high porosity or fractured zone in either the Wedge Hill Limestone or the Talama formation they will likely lose circulation with the high mud weight which will probably force them to convert over from conventional drilling to managed pressure drilling. If all of this transpires the next problem will be to keep the hole open for logging and coring and  then getting the liner (7”?) to the bottom of the hole for cementing and testing the lower zone. After testing the lower (Talama) zone we will move up the hole and test the Wedge Hill Limestone and any prospective sandstones above the limestone. I assume each of the three or more reservoir zones will be tested individually if the logs and cores show them to be prospective for oil or gas.

Reply

#58
That was a superb explanation and analysis, Pet. Thank you very much!
Reply

#59

Yes, thanks Pet. Especially in conjunction with some of your earlier stuff in this thread:

IOC has said the seismic at Wahoo is analogous to Antelope so that made me think it was the Puri. Now I think that is wrong and the reef we are looking for is probably a Wedge Hill limestone reef. This Wedge Hill reef type formation has been reported in a couple of places to have in excess of 20% porosity. If we find that kind of porosity it will be much better than what we saw at Elk/Antelope or Triceratops.

That sounds pretty interesting. I guess we'll find out sooner rather than later.

Reply

#60

And then we have PET telling us things looked pretty good looking back at history for wells in this area.  Must be why he rated Wahoo a 90 percent probability of success well . Even more important may be what Interoil said about this area same type seismics as Elk/Antelope.  Or we can throw out whatever and see if it sticks. Most should prefer PETs scientific approach .

I know I do .

Reply



Forum Jump:


Users browsing this thread: 1 Guest(s)