ANT #4 elevation
|
|
01-18-2015, 01:39 PM
I seem to recall that Total and IOC will both engage new engineering firms to provide analysis and certification is to be the midpoint between these two new firms reports. They will not be using GCA nor GLJ. I wonder if others remember it this way???
01-18-2015, 04:07 PM
Vidon .... the below is from the SPA. They can use GCA, Ryder Scott, Beicip, Netherland Sewell or Miller and Lents.
Clause 3.3 a) The Buyer must notify or must procure that the Operator notifies the Seller within five (5) Business Days of the completion of drilling (and testing) of the last appraisal well under the Appraisal Work Program. Promptly following such notification, the parties will procure the Interim Resource Certification in accordance with Schedule 4 and the Interim Resource Instruction. Schedule 4 Part 6: Within twenty (20) Business Days after any notice under clause 3.3(a) or clause 3.5(a) (such date in each case the "Trigger Date"), each of the Buyer and the Seller shall nominate an independent reputable international firm of valuers with expertise in the oil and gas industry and the capability to perform valuations on oil and gas reserves in Papua New Guinea ("Applicable Criteria") from amongst the following consultants: Gaffney, Cline & Associates, Ryder Scott, Beicip, Nederland Sewell & Associates, Inc. and Miller and Lents, Ltd., each company an "Expert".
Drivel Maven with Personality
01-29-2015, 06:15 AM
'Stavros' pid='54279' dateline='<a href="tel:1421561 Wrote:Vidon .... the below is from the SPA. They can use GCA, Ryder Scott, Beicip, Netherland Sewell or Miller and Lents. Clause 3.3 a) The Buyer must notify or must procure that the Operator notifies the Seller within five (5) Business Days of the completion of drilling (and testing) of the last appraisal well under the Appraisal Work Program. Promptly following such notification, the parties will procure the Interim Resource Certification in accordance with Schedule 4 and the Interim Resource Instruction. Schedule 4 Part 6: Within twenty (20) Business Days after any notice under clause 3.3(a) or clause 3.5(a) (such date in each case the "Trigger Date" hey Stavros, sorry I missed your answer as to acceptable values., just found it and so I am sending a belated THANKS. Those are the 5 the banks lend against . I hope they use Netherland Sewell which is whom OSH currently uses and whom has done early work on Elk Antelope. It will be what it will be.
01-29-2015, 09:56 AM
I had not recalled the 5 day notification clause. That puts into play a question whether the delay in locating and spudding A6 may be tied to a cash conservation move by Total. Hope they use a seriously powerful rig to push that A6 bit to FD.
BTW, when do we expect to hear the results of the Arb?
01-29-2015, 10:09 AM
Arb they say by end of Mar . Last 2 weeks of Mar lots of news . Will also get the new GLJ numbers with end of year results . Drilling update required.
Should also see what Netherland Sewell sees at E/A for OSH. Different opinion . Fun times ahead
(01-15-2015, 12:26 PM)petrengr1 Wrote:
In my message (#28) of Jan. 14, 2015 I told you that IOC expected the top of the formation to come in at -1,785 meters sub sea based on their new map http://tinyurl.com/n6ox33b chart 11. Today’s PR indicates that they actually expected the top to be at -1,764 meters (1,534 +230). As I said this was a surprise because that made the well much lower than had been indicated by previous maps such as IOC’s interpretation in the GLJ report of 2009 http://tinyurl.com/lrjknkq page 37 of 51. So today they said they found the top at -1,534 meters sub sea which is right on with Dave Holland’s old GLJ map from 2009. Actually this is old information as we got the same thing from OSH back on Feb. 5, 2015. They were at a depth of -1,536 meters and running 9 5/8” casing as of Jan. 31, 2015. So they have been running casing from Jan. 31st to Feb. 16th. We are now ready to drill into the reservoir at Antelope-5. This could explain why there has been no data from either Antelope-4 or 5. Neither well has drilled any reservoir rock yet.
So where does this put us? Yes, the reservoir will be 230 meters thicker than they expected based on their Jan. 12th presentation http://tinyurl.com/n6ox33b page 11 but it will be right back to the amount expected based on the old GLJ report of 2009. So we have not gained anything we have just not lost anything. This new information makes Antelope-5 higher than any other well in the field, just as expected based on the old maps.
02-17-2015, 02:42 AM
That is somewhat curious. The new methods were supposedly more accurate but it turns out the old ones were just fine, better actually.
02-17-2015, 03:04 AM
'admin' pid='55095' datel Wrote:That is somewhat curious. The new methods were supposedly more accurate but it turns out the old ones were just fine, better actually. The old GLJ maps were pretty close on both Antelope-4 and 5.
02-17-2015, 03:22 AM
The company states the purpose of the new drilling was to prove out the GLJ numbers or raise the GCA numbers . That's exactly what is happening . I was told many believe IOC will receive a number near the mid GLJ estimate without Ant Deep . Or a payment in the $2 billion range .
Phil thinks 12-15 T's or a higher payment with movement from 3c to 2 and 1 c . It's not bad news but good news . Does a payment of this size indicate a buyout offer from others??? |
|
« Next Oldest | Next Newest »
|