April 2nd OSH drilling report
#1

Hadn't seen this reported here yet.  On April 2nd OSH released a drilling report update which includes Ant 4 and Ant 5.  States Ant 5 logging and formation testing are complete and preparations have been made for the extended flow test.

http://www.asx.com.au/asxpdf/20150402/pd...x81186.pdf

Reply

#2
At this rate A4 will take 3 more months Captain Kirk?
Reply

#3
At March 17th, Ant-4 was at 2038 meters. At March 31st, 2134 meters.
Drilled in 2 weeks: 96 meters (314 ft).

Talk about slow !!!! (although to be fair, they stopped for some core samples).

Who was it that had a posthole digger to loan them ?!?!? Smile
Reply

#4
https://www.youtube.com/watch?v=oISGR5vMTmw
Reply

#5

'Putncalls' pid='56706' datel Wrote:At this rate A4 will take 3 more months Captain Kirk?

Obviously, the previous overall rate, with the downtime on the inferior rig and waiting for DPE, is not the current rate, as they have completed "a number of cores" and are drilling "ahead through the reservoir to planned total depth".

Reply

#6

'johnwgrant' pid='56707' datel Wrote:At March 17th, Ant-4 was at 2038 meters. At March 31st, 2134 meters. Drilled in 2 weeks: 96 meters (314 ft). Talk about slow !!!! (although to be fair, they stopped for some core samples). Who was it that had a posthole digger to loan them ?!?!? Smile

John - It was me.I did sharpen the old,iron "digger" and put it back in the storeroom.But when I looked the other day,it was gone.I guess someone from IOC (or Total) "borrowed it "on the QT"......the slow drilling should go faster now at Ant 4 because it was 'very sharp' Hope we hear some positive news from PRE or OSH in the not too distant future. Good fortune to you and yours.

Reply

#7
Good one Sageo.
Reply

#8
General thought: obtaining core samples is a time consuming (time = money = expensive) process. In general, InterOil has been very 'generous' with their taking of core samples. (from a non-technical, non-oil/gas person's point of view).

Question: How important are core samples to determining porosity, permeability, reefal characteristics, etc. ?
In other words, does a core sample trump other measures (including flow tests)? If so, how many core samples does InterOil need to scope out each well - a couple at the top and a couple in the middle ?

I'm looking for some experts to help me understand how much InterOil management will know about the reservoir from the core samples...

If core samples reveal a lot, you would think that InterOil management might rethink their stock buyback strategy !?!? (or lack thereof)
Reply

#9
Grant, you talk about stock buybacks as if they have unlimited cash to do whatever they want, and that is just NOT the case intermediate to long-term. Buybacks do not fit the corporate strategy now, as I have explained elsewhere.
Reply

#10
The history of Interoil shows it takes 10-14 days to drill cores . We are within the historical performance time line .
"Well cores are cylindrical rock samples collected as part of the drilling process. Cores provide valuable insight into the porosity and permeability, among other characteristics, of the rocks that are being drilled. Several types of cores can be recovered from the well, including full-diameter cores, oriented cores, native state cores and sidewall cores. For more information on types of well core, how they are collected and analyzed"
Reply