New UBS Report on IOC - Attached
#21

'trans' pid='58535' datel Wrote:

'2126' pid='58533' datel Wrote:

PET said: "Would you settle for a guess?  This list comes from the original SPA between Total and IOC. Both parties no doubt had to agree to all of the Engineering Firms included in the list. Total has bet billions of dollars that the certified resource volume is 6.5 TCF or less. Bigger is better for IOC but is worse for Total according to UBS. Since they already had the 9.9 TCFe volume calculated by GLJ, Total was unwilling to  approve GLJ to be included in the list. Total probably had their own opinion about what the resource number should be and it was closer to what Gaffney and Cline had calculated. Total apparently was not as optimistic about the effect additional drilling would have on the resource number as IOC was.

Sorry, I can't grasp the logic of  the UBS analyst that smaller is better for Total.  I see what he is trying to say, but the bigger EA is, the better is likely is for all concerned, even though TOT pays more to IOC on a sliding scale.  What about the difference between enough gas for 2 or 3 trains and the efficiencies and addl profits generated from such?  The UBS way seems like logic in reverse.  fwiw

Beicip (a French O&G consultancy) was included in the original SPA as one of the potential expert certification companies (on SPA p. 57, under Part 6©). Anyone know why they were left out of this UBS report list on their P. 7?

[/quote]

trans, see page 6 and Figure 6;  UBS has considered the higher production for higher estimates, "selecting the most appropriate development size as gas volumes increase", and modeling 2 trains of 5mtpa, or 10 mtpa, at 10 Tcfe.  See Figure 1;  there's supporting data later, but that's the bottom line.  Given the analyst's assumptions, at higher resource levels Total pays out more to IOC than it gets in increased NPV from higher production.  One of those key assumptions is a 10% discount rate in valuing that future production/cash flow.  Total may be using a lower rate of say 8%, which gives it more NPV, along with all parties which doesn't look as bad.  However, lower assumptions about future oil and LNG prices would reduce NPV for all, with IOC still getting the same payments from Total.  Of course, all this is assuming gas only from E/A, with IOC due full payments on all incremental gas, which I think is most likely to begin with.  To the extent gas is used from Antelope South or elsewhere in PRL 15, Total (and OSH) will get NPV with little if any payments due IOC (or PacLNG).  If these highest levels get certified for E/A, I think Hession and the deal he negotiated are going to look like genius and probably be what is most needed to get the stock moving back toward 100, along with the mentioned increased probability of an attempted buyout.  That would be really ironic after what happened to the stock with announcement of the deal with Total.

Reply

#22

Thanks a bunch for the UBS report, Stavros!

I've been feeling very sleepy this afternoon and wonder how well my mind is working, but it appears to me that Figure 11 on page 8 is just plain wrong, in fact really messed up in multiple ways.  Anyone else get that impression?  Also, I would say on numerous Figures, the analysts are using "PRL 15" where they should be using E/A.

On page 5 it is stated that PacLNG commissioned GC for E/A estimates certification "at the time of its sale" to OSH.  That is not correct, is it?  I thought that was done long before.

On page 10, the analyst states, "we don't believe the current appraisal program will address this potential" of IOC's claim the western fault could be further west than previously mapped based on recent gravity and seismic survey work.  Do our industry experts agree with that?  If correct, it might be worth another well further west or northwest with full cost sharing if they could fit it in and get JV approval, which might not be the case.

Reply

#23
Interoil mgt was "giddy over the Ant 5 results ". One can only conclude that excitement was over the extra bucks for the Interoil coffers from the additional size now confirmed. Sorry UBS.
Interesting we now have 3 investment banks stating $94-102 stock trading price with 10 T's. Sorry Goldman.
The Japanese banks have 5 reservoir engineers they loan against . GLJ is not one of the 5 . Really quite simple .
Reply

#24

Note page 13 UBS they believe best guess that Ant South has 4.5 T's plus Hession's obvious comments substantially more than GLJ or more than 10 T's . Add 10 plus 4.5 T's and we have 14.5 T's or hello Henry Aldorf was right and that early talk about Arun size were also correct . Further we have some modeling of 12 T's value by UBS (page 8 figure 8). My estimates If 12 T's Interoil is worth $120 per share plus $25-30 today for outside PRL-15 . With Hession trying to prove out some of the value outside PRL-15 this year . Note the largest shareholders want to build the LNG plant . But I can't image large shareholder not wanting a payday of selling part of E/A . We want to own part of E/A LNG forever for cash flow and for the ability to book assets as found because we have an ownership in a commercial plant.

Reply

#25

'Getitrt2' pid='58545' datel Wrote:

Thanks a bunch for the UBS report, Stavros!

I've been feeling very sleepy this afternoon and wonder how well my mind is working, but it appears to me that Figure 11 on page 8 is just plain wrong, in fact really messed up in multiple ways.  Anyone else get that impression?  Also, I would say on numerous Figures, the analysts are using "PRL 15" where they should be using E/A.

On page 5 it is stated that PacLNG commissioned GC for E/A estimates certification "at the time of its sale" to OSH.  That is not correct, is it?  I thought that was done long before.

On page 10, the analyst states, "we don't believe the current appraisal program will address this potential" of IOC's claim the western fault could be further west than previously mapped based on recent gravity and seismic survey work.  Do our industry experts agree with that?  If correct, it might be worth another well further west or northwest with full cost sharing if they could fit it in and get JV approval, which might not be the case.

Fresh egs from next door Coffee this am ?

<img src=" border="0" class="smilie" src="images/smilies/sleepy.gif" style="font-size: 12px;" />

Reply

#26

[quote='Getitrt2' pid='58545' dateline='1432942242']

Thanks a bunch for the UBS report, Stavros!

I've been feeling very sleepy this afternoon and wonder how well my mind is working, but it appears to me that Figure 11 on page 8 is just plain wrong, in fact really messed up in multiple ways.  Anyone else get that impression?  Also, I would say on numerous Figures, the analysts are using "PRL 15" where they should be using E/A.

On page 5 it is stated that PacLNG commissioned GC for E/A estimates certification "at the time of its sale" to OSH.  That is not correct, is it?  I thought that was done long before.

On page 10, the analyst states, "we don't believe the current appraisal program will address this potential" of IOC's claim the western fault could be further west than previously mapped based on recent gravity and seismic survey work.  Do our industry experts agree with that?  If correct, it might be worth another well further west or northwest with full cost sharing if they could fit it in and get JV approval, which might not be the case.

Answer- Page 10 - Hession stated clearly they thought Ant 5 might extend further west but I can see no reason to believe that this certification will include any of this new size beyond what's proved with the new well. But it's clearly why Hession included a second certification payment . Further the hurdle of pressure communication is a low bar for connectivity to E/A and makes one think what else might be connected within the definition of pressure communication????

Reply

#27
I’ve been reading and rereading the UBS report and SHU member reactions.

Maybe the bottom line is that the LNG industry is dying. If Total can’t buy gas at less than $2/mcf close to the world’s largest market in one of the easiest to develop new plays and make money then what hope can there possibly be for anyone to make money anywhere? If it costs $4/mcf at Henry’s Hub why would anyone want to spend money to liquify it and ship it half-way across the world?

$12.60/mcf projected market price and there’s barely a reason to invest. Six or seven years ago I seem to recall COP bought Burlington for something like $10/mcf in the ground. Boy, have times changed. And to think Total and OSH both bought into PRL 15 thinking, ‘jeez, this is going to be a really good deal if there’s barely enough gas to build a single train’. (Is the UBS piece a thinly veiled but biting criticism of TOT and OSH?)

And then there’s the statement that the results of the A5 delineation well won’t be used in the certification. Turns my world understanding pretty much upside down. I suspect the drawdown tests won’t include any gas flowing from that area to the west not previously shown in the model. Maybe since the GCA analysis was done before A3 was drilled (if my memory serves me correctly) results from that well won’t be considered either.

On the other hand, maybe this is just UBS’ way to tell Total, “See? We can write a report to demonstrate to potential buyers $14/mcf is the best deal you can get long term from anyone so you better sign up now”.

Stavros - Thanks for this entertaining lead up to the AGM.
Reply

#28

'jft310' pid='58550' datel Wrote:

[quote='Getitrt2' pid='58545' dateline='1432942242']

Thanks a bunch for the UBS report, Stavros!

I've been feeling very sleepy this afternoon and wonder how well my mind is working, but it appears to me that Figure 11 on page 8 is just plain wrong, in fact really messed up in multiple ways.  Anyone else get that impression?  Also, I would say on numerous Figures, the analysts are using "PRL 15" where they should be using E/A.

On page 5 it is stated that PacLNG commissioned GC for E/A estimates certification "at the time of its sale" to OSH.  That is not correct, is it?  I thought that was done long before.

On page 10, the analyst states, "we don't believe the current appraisal program will address this potential" of IOC's claim the western fault could be further west than previously mapped based on recent gravity and seismic survey work.  Do our industry experts agree with that?  If correct, it might be worth another well further west or northwest with full cost sharing if they could fit it in and get JV approval, which might not be the case.

Answer- Page 10 - Hession stated clearly they thought Ant 5 might extend further west but I can see no reason to believe that this certification will include any of this new size beyond what's proved with the new well. But it's clearly why Hession included a second certification payment . Further the hurdle of pressure communication is a low bar for connectivity to E/A and makes one think what else might be connected within the definition of pressure communication????

A question for Pet, or others on the technical staff concerning what will be proven with the long term test at Ant 5.  Will the amount of gas produced in the test, taken in conjuction with the pressure reduction in the reservoir resulting from the test, be used in the certification to calculate the amount of gas remaining in the reservoir?

Reply

#29
It's as if the author does not realize that the IOC Total deal was arranged to favor IOC if Antelope contained as much gas as IOC said there was?
Reply

#30

'Thylacine-2' pid='58555' datel Wrote:

'jft310' pid='58550' datel Wrote:

[quote='Getitrt2' pid='58545' dateline='1432942242']

Thanks a bunch for the UBS report, Stavros!

I've been feeling very sleepy this afternoon and wonder how well my mind is working, but it appears to me that Figure 11 on page 8 is just plain wrong, in fact really messed up in multiple ways.  Anyone else get that impression?  Also, I would say on numerous Figures, the analysts are using "PRL 15" where they should be using E/A.

On page 5 it is stated that PacLNG commissioned GC for E/A estimates certification "at the time of its sale" to OSH.  That is not correct, is it?  I thought that was done long before.

On page 10, the analyst states, "we don't believe the current appraisal program will address this potential" of IOC's claim the western fault could be further west than previously mapped based on recent gravity and seismic survey work.  Do our industry experts agree with that?  If correct, it might be worth another well further west or northwest with full cost sharing if they could fit it in and get JV approval, which might not be the case.

Answer- Page 10 - Hession stated clearly they thought Ant 5 might extend further west but I can see no reason to believe that this certification will include any of this new size beyond what's proved with the new well. But it's clearly why Hession included a second certification payment . Further the hurdle of pressure communication is a low bar for connectivity to E/A and makes one think what else might be connected within the definition of pressure communication????

A question for Pet, or others on the technical staff concerning what will be proven with the long term test at Ant 5.  Will the amount of gas produced in the test, taken in conjuction with the pressure reduction in the reservoir resulting from the test, be used in the certification to calculate the amount of gas remaining in the reservoir?

Thy- The volume produced during this connectivity test compared to the total reservoir volume is insignificant and the reservoir pressure drop compared to the reservoir pressure may also be insignificant. Even though they have very accurate pressure recorders it would be difficult to get the pressure difference accurate enough to be depended upon for an accurate determination of the over all reservoir volume. First we would have to assume there is no water drive. We would have to assume there is no expansion of the aquifer i.e. water is non-compressible. That is normally a good assumption but may not work too good for a large aquifer of unknown size and a pressure drop of 1 psi or less. The best method of determining the true resource volume is to use this method i.e. plot a graph of reservoir pressure vs. cumulative production but we need a significant amount of gas production and an accurate measurement of the pressure drop. We are set up to have our last call for a final certification after  producing up to 20% of the gas. At that point, or before, they will probably use this method.

For this first certification I think they will still rely on measurements of porosity, water saturation, net pay thickness, areal extent and top of pay based on seismic. They will have to extrapolate these parameters  from the wells that have been drilled to the overall  reservoir. The connectivity test may be used to increase the connectivity uncertainty factor which may raise the resource volume a bit.