""In my meeting with senior executives at Total S.A., they reaffirmed their committment to developing the third train of LNG in Papau New Guinea" is unlikely to be a statement about the number of trains in our project, but rather that Total executives reaffirmed their committment to the development of the next LNG train(s) in Papau New Guinea."
Per IOC IR that was a bad quote from the conference in Europe. It was someone from Exxon who made the mention of a third train and it was for PNG LNG. Nothing to do with Total or our project. Total only committed to the EA LNG project and was just reiterating that to O'Neill.
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
So Hession lied when he said at least 2 trains???
Posts: 6,851
Threads: 697
Joined: Dec 2011
Reputation:
441
You really have us all confused me thinks. "At least 2 trains" means a normal 2-train startup. That's all we need. If they announce as soon as we hope, that's all they'll likely say, "We are announcing plans for an expected 2 train xmpta/train startup." They MAY mention expectations of expansion, but that's pretty much expected as the economics improve greatly beyond two trains and investors more likely to jump in and lenders to lend. IF they mention possible expansion, it will be very vague as it will be based on further drilling and proving up, which they are just getting started on.
If he had said, "At least 3 or 4 or 12", then we could say they really "know" right now that they will immediately expand. But "at least 2" means 2 trains. Can't assume more just because it sounds better.
Posts: 8,568
Threads: 1,342
Joined: Dec 2011
Reputation:
380
Palm-Most likely he was saying 2 trains to start and more after that hopefully . Since PNG is still a 3 rd world country assuming what's in the press as being reported accurately even with quotes may be a push . I was the one who contacted IR and got the answer I gave you . So I know what IR stated.
Hard to believe ONeil got it wrong in his journal about an Antelope/Total 3rd train . But maybe he had someone else write that journal entry for him . Could have happened that way.
Here's how Cheniere Energy did its 6 train build . Two trains to start with a plan to build six. The second build trains 3 and 4 were stated less than a year after the first 2 .
When someone says 3 trains does not mean they all start construction at the same time .
Could build out Antelope similar to Cheniere just with a staggered start .
Sabine Pass Liquefaction, LLC, a subsidiary of Cheniere Energy Partners, L.P. (Cheniere Partners), is developing natural gas liquefaction facilities at the Sabine Pass LNG receiving terminal located in Cameron Parish, Louisiana adjacent to the existing regasification facilities. The Sabine Pass site can readily accommodate up to six liquefaction trains capable of processing over 3.5 Bcf/d of natural gas. The production capacity of each LNG train is being designed for approximately 4.5 mtpa. The 1000+ acre Sabine Pass site is strategically situated to provide LNG export services given its large acreage position, proximity to unconventional gas plays in Louisiana and Texas, its interconnections with multiple interstate and intrastate pipeline systems, and its premier marine access less than 4 miles from the Gulf Coast. The trains are being developed in three stages, with stages including Trains 1&2, Trains 3&4 and Trains 5&6.
Cheniere estimates that construction of the liquefaction capacity is competitive due to expansion economics, since the Sabine Pass LNG terminal already has many of the facilities required for an export terminal. Sabine Pass Liquefaction will have access to the existing infrastructure, including five storage tanks and two berths at the Sabine Pass terminal, as well as Cheniere Partner’s 94-mile Creole Trail Pipeline, which is being reconfigured to reverse the flow of natural gas, making it a bi-directional pipeline.
Construction commenced on Trains 1&2 in August 2012. Construction commenced on Trains 3&4 in May 2013. The first LNG train is expected to produce LNG in late 2015, with the remaining three LNG trains being