Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Woodside Brow$e FLNG enters FEED
#1

Must not have read about that LNG glut

**********

Operator Woodside Petroleum has entered the front-end engineering and design phase for its Browse floating liquefied natural gas project off Western Australia.

The FEED phase of the project will see the Browse joint venture partners carry out activities to finalise the costs and technical definition for the proposed project ahead of a final investment decision which is expected in the second half of next year.

“We are excited to be moving into the next phase of the Browse FLNG development using FLNG technology,” Woodside chief executive Peter Coleman said.

“We will continue to work with governments, Australian industry, local communities and other relevant stakeholders to realise potential opportunities from this mega project.”

Woodside said Wednesday the joint venture had also entered into an equity alignment deed which will see the partners exchange equity interests to establish a single aligned interest for each of the participants across the combined Browse project.

Under the deed, Shell's share in the project will remain the same at 27%, BP's stake will fall from 18% to 17.33%, Mitsubishi-Mitsui (MiMi) will see its interest drop from 14.7% to 14.4%, while PetroChina will gain an increase in equity from 9% to 10.67%.

The agreement will see Woodside's current 31.3% operated interest in the project decrease to 30.6%, meaning its net share in the project's best estimate contingent resources would amount to 4.7 trillion cubic feet of gas and 138.6 million barrels of condensate.

The move into the FEED phase comes after Woodside accepted renewal offers from the West Australian and federal governments related to the seven retention leasescovering the project – WA-28-R, WA-29- R, WA-30-R, WA-31-R, WA-32-R, TR/5 and R2.

Under the terms of the renewal for the retention leases which lie in waters controlled by the West Australian government, Woodside and its partners also agreed to reserve about 750 billion cubic feet of gas to be sold into the state's domestic market.

Due to Western Australia's domestic gas reservation policy, the Browse joint venture is required to reserve gas equivalent to 15% of production from the state’s own share of the Torosa field, which is one of the three feedstock fields.

It marks the first time the state's gas reservation policy has been applied to a FLNG project, with Shell's Prelude project off Western Australia exempt as the field lies in federal waters.

The Browse FLNG project will comprise of three FLNG vessels which will be designed to produce between 3.5 million and 4 million tonnes per annum of LNG.

The project will be fed by three fields – Torosa, Brecknock and Calliance – which all lie in the offshore Browse basin, in water depths of up to 750 metres, and are estimated to hold a combined best estimate contingent resource of 15.4 Tcf of gas and 453 million barrels of condensate.

Reply

#2
Don't they know there's a GLUT!!
Reply

#3
Those that claim a glut think all proposed plants will be built and contracts that expire will suddenly find more gas and demand will fall in fastest middle class growth area of the world . That's reality sure it is !! Oil is going to $30 a barrel also with the U.S. rig count down 50 percent and we have peace in Iraq and Iran promises to let inspectors in their nuclear enrichment facilities . Reality check may be in order !!!
Reply



Forum Jump:


Users browsing this thread: