InterOil and its partners are behind Total's selected development concept for the French operator's Elk-Antelope liquefied natural gas project in Papua New Guinea.

Upstream first reported earlier this week that the Paris-based supermajor had decided on its preferred development concept for the project, including the crucial issue of where to locate the LNG plant.

Sources told Upstream that the LNG plant would be located at Caution Bay near the capital city of Port Moresby. This is the same location as the ExxonMobil-operated PNG LNG facility.

InterOil confirmed on Thursday that Caution Bay has been selected as the site for PNG's second LNG site.

"The central processing facility for the Elk-Antelope gas field, on which the project is based, will be near the Purari River in the Gulf Province, about 360 kilometres north-west of Port Moresby, and will be connected to the LNG facility by onshore and offshore gas and condensate pipelines," it contined.

The project is to be known as Papua LNG.

"Selection of the final development concept, including the size and capacity of facilities, is expected in early 2016 when appraisal of the Elk-Antelope field has been completed," InterOil continued.

"This will be followed by front-end engineering and design with early works scheduled to begin later in 2016."

InterOil Chief Executive Dr Michael Hession said: "Sites were chosen for their technical, economic and environmental benefits and followed extensive surveys and studies by Total over the past year.

"These sites represent the best locations. The central processing facility in the Gulf Province will be near the gas field with river access. The LNG facility near Port Moresby has potential for synergies with existing infrastructure and sufficient land for significant LNG train expansion."

On the one hand, Caution Bay was the obvious choice, but on the other hand there was political pressure in PNG for the LNG plant to be located in Gulf Province, which hosts the Elk-Antelope fields, sources told Upstream earlier this week.

InterOil said earlier this month the project’s estimated capital expenditure would be about 13% less than the PNG LNG project, which cost US$19 billion.

The forecast construction cost would be about US$2050 per tonne of LNG.

A 90-kilometre onshore pipeline would connect the Elk-Antelope fields with the coast, and a 340-kilometre subsea pipeline would carry gas to Caution Bay.

The Elk-Antelope project is located in Block PRL15. It is operated by Total with a 40.1% interest, InterOil on 36.5%, Oil Search 22.8% and minority interests 0.5%.

Reply

#2
I didn't see anything to suggest a PNG Go Ahead.
Reply

#3
HIIR. "... and will be connected to the LNG facility by onshore and offshore gas and condensate pipelines."

Condensate pipelines to Caution Bay? A BIG Go Ahead for Petrochemical plants anybody? Duel use jetty's for LNG and condensate exports?
Reply

#4
Good pickup Tucker. Size of pipelines will also be interesting as spurs will likely be included for license areas down the coast.
Reply

#5
Well, given that astute out-sight I will compliment with one word. WAHOO !!

;-)
Reply

#6
I still haven't seen anything about government approval the site selection. Of course it would seem silly to announce this without government backing. Maybe it's O'Neill's preference to let The Games carry the news cycles for the next couple of weeks hoping they mute the Gulf Province response to this selection. Que sera.
Reply

#7
Someone has to be the wet blanket here. It's a 6 month delay on FEED and the size of the plant which determines the cash flow is undefined until after the delayed certification.
Reply

#8
The 13% less that 2 billion is a good indicator of the size of the plant but that was left out of the IOC version.