#1

Antelope-6 drilling under way Singapore and Port Moresby, December 24, 2015: InterOil Corporation (NYSE: IOC; POMSoX: IOC) has been advised by Total E&P PNG Limited, operator of Petroleum Retention License 15 in the Gulf Province of Papua New Guinea, that it has begun drilling the Antelope-6 appraisal well. The well is designed to provide structural control and reservoir definition on the field’s eastern flank. It has a proposed total depth of around 2,464 meters (8,084 feet) true vertical depth sub-sea and is located about 2km east-south-east of Antelope-3. InterOil holds a 36.5375% interest in the well. Total E&P PNG Limited has a 40.1275% interest, Oil Search has 22.8350%, and the remaining 0.5000% is held by minority parties.

Reply

#2
Will this have an impact on PPS Justin? .... ZILCH I suppose.

Or ... OREZ

Read the below in your spare time as a lesson in US voting history:

http://nowiknow.com/backwards-forwards/
Drivel Maven with Personality
Reply

#3
Better than Christmas potatoes! I wonder what ONeill's view is on these delays. No matter. Total is in charge. Still we are left wondering what Hession and gang are doing for their handsome salaries and benefits this coming year.
Reply

#4
We have at least 3 Interoil executives state they are working on a second deal for TBR with reported 8 T's . Exxon could save a Billion dollars vs developing P'Nyang with a deal with Interoil .
Reply

#5
That would boost the old Christmas spirit or New Year's revelry a deal with Exxon with TBR.
Reply

#6

Here is a question for you to contemplate. Why are they drilling the well to -2464 meters sub sea when the known gas/water contact is -2214 meters sub sea? That would be 250 meters or 820 feet below the gas/water contact. I do not have an answer for that question.

For the record I think GLJ had the gas/water contact about right at -2228 meters sub sea. They have been using -2214 most recently but they have said that the results from Antelope-4 and Antelope-5 indicate the gas/water contact is lower than previously thought.

Reply

#7

Here is a question for you to contemplate. Why are they drilling the well to -2464 meters sub sea when the known gas/water contact is -2214 meters sub sea? That would be 250 meters or 820 feet below the gas/water contact. I do not have an answer for that question.

For the record I think GLJ had the gas/water contact about right at -2228 meters sub sea. They have been using -2214 most recently but they have said that the results from Antelope-4 and Antelope-5 indicate the gas/water contact is lower than previously thought.

Reply

#8

petrengr1 dateline='<a href="tel:1450969269">1450969269</a>' Wrote:

Here is a question for you to contemplate. Why are they drilling the well to -2464 meters sub sea when the known gas/water contact is -2214 meters sub sea? That would be 250 meters or 820 feet below the gas/water contact. I do not have an answer for that question.

For the record I think GLJ had the gas/water contact about right at -2228 meters sub sea. They have been using -2214 most recently but they have said that the results from Antelope-4 and Antelope-5 indicate the gas/water contact is lower than previously thought.

Here's my two cents.  Since there is a fairly defined GWC in the field, then there  will be a water drive affecting recovery efficiency which will be much lower than a pure depletion drive.  So maybe this depth is to define the bottom limit of the reservoir to better understand and model the size and response of the aquifer.  This might reduce the duration of any futher planned production testing also.

Reply

#9

'petrengr1' pid='65510' datel Wrote:

Here is a question for you to contemplate. Why are they drilling the well to -2464 meters sub sea when the known gas/water contact is -2214 meters sub sea? That would be 250 meters or 820 feet below the gas/water contact. I do not have an answer for that question.

For the record I think GLJ had the gas/water contact about right at -2228 meters sub sea. They have been using -2214 most recently but they have said that the results from Antelope-4 and Antelope-5 indicate the gas/water contact is lower than previously thought.

Pet - Good am to you. When I read Justin's report a few minites ago, that was the first question that popped into the old noggin . Hmn...very,very interesting ! [ I still like the idea that in Ant 5,they drilled an additional 850 ft or so without cutting the fault (to the west)  ].As always, in the future "we will know more".

Reply

#10
To All You Petroleum Engineering Folks:

I'm a Chemical Engineer, not a Petroleum Engineer ...

It's my understanding that a "Depletion Drive" reservoir is far less efficient than a system that has a "Water Drive"

In other words, far more of the gas-in-place is recovered when the reservoir has a "Water Drive" displacing the gas and pushing it out.

Am I correct?