Thread Rating:
  • 1 Vote(s) - 5 Average
  • 1
  • 2
  • 3
  • 4
  • 5
What should we expect at Antelope-3 and Elk-3?
#16
Thanks Pet. From memory, net pay at Elk1 was only 88ft, and Elk 4 only double that, I think, although (also from memory), I don't think Elk1 was drilled to full debt, considering the amount of trouble they had while drilling ("stemming the tide of the Mississippi..")

If Elk3 proves 300ft+ of net pay, that more than three times Elk1 and more than double Elk4, shouldn't that increase the numbers a notch or two? I realize it's probably low porosity rock, so not by a whole lot, but at least by some, if this pans out.
Reply



Messages In This Thread
RE: What should we expect at Antelope-3 and Elk-3? - by admin - 10-10-2012, 12:09 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)