04-07-2013, 02:19 PM
'Tree' pid='20260' dateline='<a href="tel:1365298 Wrote:
XOM's sub sea dry gas pipeline is 34" diameter to feed 6.6 Mtpa PNG/LNG with expansion plans.IOC's dry gas pipeline from CSP to LNG plants is 36" diameter.
Question is how much conditioned gas can be pushed through that subsea? Once PNG LNG has enough gas for 4 trains, how much redundancy is needed; if PNG LNG finds just enough gas, do they need a tie-in should something go wrong with a well or gathering line?

