'jft310' pid='28472' datel Wrote:Worst case we have the PNG govt's GCA certification which was before Antelope 3 and was for 6.3 T's more than enough for the third Exxon train. Then we have what's left which is the question. Others seem quite interested in what's left. It's quite clear no one is talking to Blair about the status of the Exxon third train deal. When Bonk talks about an IOC story before its been written about we know its been made up by the shorts to take advantage of the news gap. Shame on Blair for not checking his stories closer and writing abiut something without verifrication. But alas he hasn't signed a CA so really knows nada just has a boss who lets him write what he wants. In the US responsible journalist need two sources and the editor requires verification before publishing a story or the story doesn't get printed. Alas this is PNG without such standards. I am sure there are financial gains for all the additional eyeballs attracted to PNG Industry News and credibility may not be the driving force..
My recollection is that the GCA Best Case estimate that was leaked at the beginning of 2012 was 6.6 Tcfe and its High Case estimate was in excess of 12 Tcfe. These estimates were provided prior to the drilling of Antelope 3, which had good porosity and likely increased GCA’s P-50 estimate to >7 Tcfe. Another well in the E-W segment of the Antelope reef would likely materially increase GCA’s P-50 estimate.
The recertification protocol for PRL 15 hasn’t yet been disclosed, but it would be logical for the two companies to select GCA to provide the resource evaluation (given that GCA has already conducted extensive work and given its conservatism, reputation, Exxon’s comfort with GCA, etc… ) . While the market is only ascribing credit now for 4.6 Tcfe in InterOil’s valuation (using Pavel’s $1.20 per mcf NAV, 4.6 Tcfe is worth ~$3.2 billion to InterOil – almost its entire current market cap), if GCA were selected to conduct the reappraisal, its current Best Case estimate would likely be considered a minimum estimate that will build higher with the Exxon funded drilling program. At 7 Tcfe, Elk/Antelope is worth ~$100 per share net to InterOil at $1.20 per mcf. If the revealed drilling locations and release of the GCA technical data result in the market’s confidence that the GCA and GLJ estimates will soon collapse to GLJ’s current estimate, the same analysis would result in almost $7 billion of value net to InterOil from Elk/Antelope or almost $140 per share. And if the drilling program concentrates on the E-W section of the Antelope reef and GCA’s Best Case estimate moves towards its High Case estimate, there is very significant further upside. Also, if InterOil’s remaining stake in PRL 15 beyond what Exxon’s 4.6 Tcfe in Elk/Antelope translates into gets revalued to a true economic NAV based on a 4th train at PNG LNG or the Gulf Project, its residual value per mcf could be a multiple of the initial SPA value.
Hence it’s easy to see how Elk/Antelope could provide significant upside to InterOil shares with the disclosure of the SPA details. If GCA provides the recertification figures, the market will have a minimum Best Case estimate to value that is already significantly in excess of 4.6 Tcfe.
Peter Graham’s assertion that the “field offered enough gas for “at least” one additional train for the existing two-train PNG LNG project” is consistent with the terms of the SPA, which is a non-contingent purchase agreement and implies that Exxon is committed to underpinning at least one train with Elk/Antelope. It’s also no surprise that a second train underpinned by Elk/Antelope requires more drilling, but if GCA’s P-50 estimate already exceeds 7 Tcfe, there may only be another well or two required for a second train to move ahead and the current residual Best Case resource at Elk/Antelope in conjunction with Triceratops may be adequate for a supermajor to soon move ahead with a Gulf LNG Project.