Korea: Rapid demand recovery—on track to consume 35 mn tpa by 2015
In 2010 South Korea consumed 32.6 mn tpa of LNG, a 26% YoY gain from 2009, as LNG enjoyed the national economic recovery and substituted oil in the power and industrial sectors. We forecast 2011 demand will be 34 mn tpa, a further 4% YoY rise. We forecast LNG will reach its peak demand in 2014, hitting 35 mn tpa before gradually falling back with economic maturation and the effect of increasing nuclear penetration in the primary energy mix.
25 mn tpa contracted in the near term—supply ‘gap’ for next five years
Prolonged domestic friction over who has the right to contract for LNG imports has left South Korea in a position where the rapid demand recovery creates a shortfall versus contracted supply. The issue is that Kogas has been the nominated monopoly importer, on-selling purchased LNG through its distribution infrastructure to the power and city gas sectors who have long felt that they should have the right to contract directly with LNG suppliers. In between Kogas and its customers is the Ministry of Knowledge and Economy, which has to approve all LNG long-term contracts. The Ministry of Knowledge and Economy has historically been inclined to supporting the end users’ desire to contract directly to reduce Kogas’ monopoly position but has struggled to implement a comprehensive deregulation of gas importation. The result has been an absence of Korea as a buyer of uncontracted LNG versus requirements in the 2012 to 2016 period.
5 mn tpa contracted from 2015, rising to 10 mn tpa in 2017
Korea has contracted roughly 5 mn tpa from green-field LNG projects in Asia that plan to deliver first gas in 2015 (Chevron’s Gorgon is 0.5 mn tpa of the above – due to deliver first gas in 2014), with Santos’s GLNG project making up the bulk of that increment. Shell’s recently sanctioned
Prelude FLNG project offshore Western Australia is slated to convert its MoU for 3.6 mn tpa into an SPA imminently, and Total has agreed to supply 2 mn tpa from its portfolio—1 mn tpa of which we assume comes from the Inpex operated Ichthys LNG project. For both Total and Shell’s deals our base numbers assume supply commences with project 1st gas, however the sellers may have agreed to supply some or all of the contract avails prior to 1st gas from their respective portfolio supply pools.
In 2010 South Korea consumed 32.6 mn tpa of LNG, a 26% YoY gain from 2009, as LNG enjoyed the national economic recovery and substituted oil in the power and industrial sectors. We forecast 2011 demand will be 34 mn tpa, a further 4% YoY rise. We forecast LNG will reach its peak demand in 2014, hitting 35 mn tpa before gradually falling back with economic maturation and the effect of increasing nuclear penetration in the primary energy mix.
25 mn tpa contracted in the near term—supply ‘gap’ for next five years
Prolonged domestic friction over who has the right to contract for LNG imports has left South Korea in a position where the rapid demand recovery creates a shortfall versus contracted supply. The issue is that Kogas has been the nominated monopoly importer, on-selling purchased LNG through its distribution infrastructure to the power and city gas sectors who have long felt that they should have the right to contract directly with LNG suppliers. In between Kogas and its customers is the Ministry of Knowledge and Economy, which has to approve all LNG long-term contracts. The Ministry of Knowledge and Economy has historically been inclined to supporting the end users’ desire to contract directly to reduce Kogas’ monopoly position but has struggled to implement a comprehensive deregulation of gas importation. The result has been an absence of Korea as a buyer of uncontracted LNG versus requirements in the 2012 to 2016 period.
5 mn tpa contracted from 2015, rising to 10 mn tpa in 2017
Korea has contracted roughly 5 mn tpa from green-field LNG projects in Asia that plan to deliver first gas in 2015 (Chevron’s Gorgon is 0.5 mn tpa of the above – due to deliver first gas in 2014), with Santos’s GLNG project making up the bulk of that increment. Shell’s recently sanctioned
Prelude FLNG project offshore Western Australia is slated to convert its MoU for 3.6 mn tpa into an SPA imminently, and Total has agreed to supply 2 mn tpa from its portfolio—1 mn tpa of which we assume comes from the Inpex operated Ichthys LNG project. For both Total and Shell’s deals our base numbers assume supply commences with project 1st gas, however the sellers may have agreed to supply some or all of the contract avails prior to 1st gas from their respective portfolio supply pools.