12-20-2011, 01:08 AM
Eyeofthetiger- Putncalls is correct, there will be no injection wells. Initially IOC said they would have such a project but the economics of such a project would have been questionable in my opinion. I argued that they would have to have at least 30 bbl/MMCF to consider such a project. In any case they have decided to produce the gas through the condensate stripping plant at the field location and then send the gas and condensate to the Gulf coast where the LNG plants and export facilities will be located. I believe the plan is to liquefy the gas for export and send the condensate to the IOC refinery at Napa Napa - Port Moresby.
The existing wells, Elk-1, Elk-4, Antelope-1 and Atelope-2 will all have to be re-completed to be suitable for use as producing wells. IOC says they plan to produce the wells at rates up to 200 MMCFD each. That sounds a bit high to me but it can be done with two large flow lines off of each well head. I doubt that Elk-1 and Elk-4 will produce at rates as high as 200 MMCFD but the other two wells are capable of rates that high.
The number of wells required will depend on how much gas is to be liquefied and exported. As they put the LNG plants in in stages they will need 2 wells for 3 mtpa, 3 wells for 5 mtpa, 5 wells for 7.6 mtpa and 7 wells for 10.8 mtpa. Since Elk-1 and Elk-4 are probably not capable of 200 MMCFD and since they will need a couple of spare wells in case something goes wrong with a producer I would say they will need at least 10 wells to be sure they can maintain continuous supply to a 10.8 mtpa LNG plant.
I expect them to use Elk-2 for water disposal but IOC has never said that is their plan.
The existing wells, Elk-1, Elk-4, Antelope-1 and Atelope-2 will all have to be re-completed to be suitable for use as producing wells. IOC says they plan to produce the wells at rates up to 200 MMCFD each. That sounds a bit high to me but it can be done with two large flow lines off of each well head. I doubt that Elk-1 and Elk-4 will produce at rates as high as 200 MMCFD but the other two wells are capable of rates that high.
The number of wells required will depend on how much gas is to be liquefied and exported. As they put the LNG plants in in stages they will need 2 wells for 3 mtpa, 3 wells for 5 mtpa, 5 wells for 7.6 mtpa and 7 wells for 10.8 mtpa. Since Elk-1 and Elk-4 are probably not capable of 200 MMCFD and since they will need a couple of spare wells in case something goes wrong with a producer I would say they will need at least 10 wells to be sure they can maintain continuous supply to a 10.8 mtpa LNG plant.
I expect them to use Elk-2 for water disposal but IOC has never said that is their plan.