04-09-2014, 07:45 AM
As I stated, in the March presentation (slide 29), they stated that "drilling to determine size and shape of Hides" was "underway" as part of what they were doing in "moving forward on LNG expansion plans", which contradicted your statement that, "The only drilling going on by PNG LNG partners right now is at Hides for their wells that will supply trains 1 and 2". That is the only thing about which I was asking whether there had been a change since then, given the contradiction. Or did they just lie or make an erroneous statement about the drilling?
OSH had announced the PRL 15 deal before the March conference, and on the same slide 29 stated, as I said above, that PRL 15 was "commercially attractive on both a stand alone or expansion basis", so that listing it as a possible source for expansion of the PNG LNG project at the Asian conference was not a change.
As I also stated, they mentioned as well in March P'nyang as a potential source for part of expansion, but not enough for a train; and I was already aware of the estimate and that it is not currently an official part of the PNG LNG JV, so that none of that is a change.
There was no mention in the March presentation slides specifically of "Hides Deep", so that may be a change, unless they covered it orally as part of the general mention of "Hides" on the slide.
Therefore, not a lot has changed on what I was talking about; and the one question I raised about whether there had been a change to their claim of current drilling at Hides remains unanswered, which is okay, and not that important.
OSH had announced the PRL 15 deal before the March conference, and on the same slide 29 stated, as I said above, that PRL 15 was "commercially attractive on both a stand alone or expansion basis", so that listing it as a possible source for expansion of the PNG LNG project at the Asian conference was not a change.
As I also stated, they mentioned as well in March P'nyang as a potential source for part of expansion, but not enough for a train; and I was already aware of the estimate and that it is not currently an official part of the PNG LNG JV, so that none of that is a change.
There was no mention in the March presentation slides specifically of "Hides Deep", so that may be a change, unless they covered it orally as part of the general mention of "Hides" on the slide.
Therefore, not a lot has changed on what I was talking about; and the one question I raised about whether there had been a change to their claim of current drilling at Hides remains unanswered, which is okay, and not that important.