The top tier rate remains the same because what they pay is based on the % of the resource being bought by Total. So they are buying 40.1% of x (which represents the top tier) instead of 61.3% of x. But the $1.00/mcfe stays the same. The $1.29 rate that Hession used was an amount he came up with that was post govt buy-in. He backed into that rate by taking the $1.00 and dividing it by 77.5% (which is 100% less the gov't 22.5%). So $1.00/.775 = $1.29.
I think that caused a bit of confusion, but it's basic algebra.
I think that caused a bit of confusion, but it's basic algebra.

