'sageo' pid='43538' datel Wrote:
'Thylacine-2' pid='43536' datel Wrote:As I recall, the side tracks at Bobcat were attributed to the shale seal rock being sticky. Has there been mention of delays at Wahoo?Thy- I believe MH said,"Wahoo.....late April or early May" (or words to that effect) for some reports. The pps since then is not looking like positive results are coming soon, if at all. [ not trying to be pessimistic,just realistic ] Sure hope I will be surprised eventually.
Sageo, this may help.......Peteng once said the heavy lifting work is done right before entering formation, in order to control the potential high pressure potential in the formation. Otherwise the well can blow out, liner, casing, BOP, other technical stuff, but you get the idea. I figured that stuff was likely 5-7 days work. So my take is that we are close to the formation by now, despite some delay, and are likely doing the grunt work before attempting to to into the formation. So likely not a place yet for good or bad news, but close. Maybe Pet can give his much moore precise thought than my best guesses. trans
PS, stock T?A is likely making a low area here, imo

