06-11-2014, 10:58 AM
'ebster123' pid='44691' datel Wrote:Devils advocate, seems logical but if MH and the rest are experts then why didn't they know this??
That's the point. They did know this. They must have felt that some technological improvement was going to trim a lot of time off the current well. Anyway you look at it, the 60 day estimate seems quick for a location where most if not all materials have to be flown to the rig site. Not sure if that applies to Wahoo specifically, but WA made that comment to me once. "Every nut and bolt," he said.
As noted previously, Wahoo and Bobcat are now in the same time window for potential reporting. Watch Bobcat come BEFORE Wahoo with no mention of Wahoo status!. I don't think I've heard anyone say that. I wouldn't bet on it but anything is possible. Let's hope Raptor is not first, because that can't be good news for the other two.