'kommonsents' pid='47648' datel Wrote:That would indicate Train 3 coming online around 2019, more or less, or about a year sooner than a new greenfield LNG plant
If we assume Well-pad G wells get connected by the end of this year (I expect a few months earlier as most likely), how long does it take to order the modules (identical to train 1 and 2) and progressively ship them as they get completed to PNGLNG and assemble them as they arrive? They can do the foundation work for the modules while the first modules are being built.
If they were serious this should be possible to do over 1.5 to 2 years.
My best guess would be train 3 coming online some time second half of 2016, or at least very early 2017 (first quarter).
We have to wait untill Well-pad G wells get finished and neww reserves get calculated for Hides and for P'Nyang. therefore we have to wait untill the end of this year to see what is possible. It may even be worse that this because they may have to finish drilling Hides 5 well (PWD) to get a better understanding of where the water table precisely is before doing the new Hides reserve calculations, so things could stretch into 1st quarter of 2015 before they start train 3 should it be possible.