08-14-2014, 01:09 AM
'Palm' pid='48460' dateline='<a href="tel:1407939 Wrote:Per the MD&A for the 6 months ending June 30 the site prep, pre-spud and drilling costs for the 3 exploration wells were as follows:
Q2 YTD 6/30
$24.4 $36.4 Costs for site preparation, pre-spud work and drilling of the Raptor-1 well.
$19.2 $26.5 Costs for site preparation, pre-spud work and drilling of the Wahoo-1 well.
$24.3 $32.1 Costs for site preparation, pre-spud work and drilling of the Bobcat-1 well.
Nowhere near where someone was saying a while back.
Thx Palm. Hopefully those reporting those wild numbers will challenge their sources a little more diligently. I recall seeing $75 million per well and climbing a couple weeks back.