'Palm' pid='48478' datel Wrote:
'sageo' pid='48464' datel Wrote:
'Palm' pid='48460' datel Wrote:Per the MD&A for the 6 months ending June 30 the site prep, pre-spud and drilling costs for the 3 exploration wells were as follows:
Q2 YTD 6/30
$24.4 $36.4 Costs for site preparation, pre-spud work and drilling of the Raptor-1 well.
$19.2 $26.5 Costs for site preparation, pre-spud work and drilling of the Wahoo-1 well.
$24.3 $32.1 Costs for site preparation, pre-spud work and drilling of the Bobcat-1 well.
Nowhere near where someone was saying a while back.
Palm - Thanks much for those numbers. Also,do you know if the new Zebra seismics are east of Elk or east of Antelope ? Appreciate your help.
Sageo, I believe Zebra is SE of EA a ways. It's in PPL 476 which is east and then goes down to the SE of PRL 15 toward Wahoo.
Palm - More thanks for your follow-up. I will try to find those seismic lines on another site. Very much interested in what they might reveal .