Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Look at slide 21 /comparison Kapuri/Wahoo
#3

'Dr. Wu' pid='48476' datel Wrote:

So now Wahoo has become a when not if.. They could have drilled it, fulfilled the obligation and moved on - so I find this re-effort very interesting.  Question is, what do they do differently?  New rig, same rig with diff bits, horsepower or heavier mud.. or something else.  Pet, any thoughts?

Dr. Wu- Slide 21 can be interpreted to mean they are only at about 4,000 feet. Hession would not answer a question about up grading the rig. At the apparent depth of this well the rig horsepower should not be a problem. I think they wanted to change the BOP from a 5,000 psi to a 10,000 psi before proceeding. If they want to use managed pressure drilling like they are doing at Bob Cat and Raptor they may also need a high pressure rotating head. Other wise I think the equipment should be OK. I believe they may have used up all of their casing sizes too early and the hole size got too small. They may need to start over from the surface with a new casing program. Either more sizes or set the casing strings deeper as they go.

If they are at about 4,000 feet I do not think the pressure can be more than 4,000 psi at that depth. At this depth their report of the pressure being "nearly 1.5 x Antelope" still does not compute. They have mentioned gas but have not said their mud weight was unable to control the pressure. If they are near 4,000 psi at 4,000 feet they would need a mud weight of over 19 lb/gal. Mud that heavy would probably be hard to handle, especially in a small hole.

I guess we will have to wait and see what the new plan is and when it will commence.

Reply



Messages In This Thread
RE: Look at slide 21 /comparison Kapuri/Wahoo - by petrengr1 - 08-14-2014, 12:40 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)