03-06-2012, 01:49 AM
Some other things to note. On the new presentation Slide 11 which is the Gulf LNG Development Map, there are a couple of differences; Pet usually is a big help on why these changes might be there:
1. Condensate Stripping Facilities; the last presentation showed "12-14” Infield gas gathering pipelines", the new states, "8-14" Infield gas gathering pipelines"
2. Condensate Pipeline- New presentation adds, "120km buried 36" dry gas pipeline from CSP to liquification plants at Gulf and a 12-20" pipeline to floating LNG at jetty export terminal facilities" to the Upstream from Midstream; interesting
3. New presentation simply states "Liquification Plants of 8mtpa capacity with potential for expansion." Prior mentioned both land based and FLNG.
1. Condensate Stripping Facilities; the last presentation showed "12-14” Infield gas gathering pipelines", the new states, "8-14" Infield gas gathering pipelines"
2. Condensate Pipeline- New presentation adds, "120km buried 36" dry gas pipeline from CSP to liquification plants at Gulf and a 12-20" pipeline to floating LNG at jetty export terminal facilities" to the Upstream from Midstream; interesting
3. New presentation simply states "Liquification Plants of 8mtpa capacity with potential for expansion." Prior mentioned both land based and FLNG.