10-01-2014, 01:54 AM
I heard the 6 months exclusive OSH right to negotiate with the remaining IPI had a bearing on slow drilling timing. FWIW dept. That has lapsed now..Ltinvest in a seperate comment heard they might be slow in drilling because of the Arbitration who knows. Might be some on going negotiations ..
Meg Lasalle today stated remember how deep these wells are being drilled. Raptor is 4500 meters , Bobcat 3100 meters??I think , deeper/over pressured drilling than any other Interoil well. Deep drilling takes time she was saying. I asked for a DST when they drill ahead into the formation.
Meg Lasalle today stated remember how deep these wells are being drilled. Raptor is 4500 meters , Bobcat 3100 meters??I think , deeper/over pressured drilling than any other Interoil well. Deep drilling takes time she was saying. I asked for a DST when they drill ahead into the formation.

