(10-15-2014, 09:51 AM)jft310 Wrote: Wonder what debotleneck plants, pipes and facilities means
The name plate LNG capacity of any plant is not the maximum limit of production of that plant. Everything is engineered with some extra capacity (maybe 20% or so) built into the design. This is so that name plate capacity can still be reached should some of the design or construction become under capacity or marginal. Virtually all new LNG plants, after they start up, are studied while working to see where changes can be made to get the total plant to produce at a higher rate.
The problem that PNGLNG faces happens to be one of economics. Should PNGLNG have a limited extra gas supply, then is it better to use that gas in a more efficient and 20% larger capacity plant, or is it better to use that gas with the less efficient smaller capacity plant but to add an extra LNG train. It is quicker to improve efficiency but takes longer to add an extra train that produces more LNG capacity.