'petrengr1' pid='52065' datel Wrote::
Mostly a re-hash of what you can see for yourself.
Slide 6-
1. Antelope-4 spud Sept. 16, 2014
2. Antelope-5 expected to spud in 4th Qtr. 2014
3. Average of GLJ and GCA P-50 numbers is 8.5 TCF before drilling appraisal wells.
4. Will begin both offshore and onshore pipeline surveys in Dec. 2014.
Slide 7 -
1. Cost of Elk/Antelope LNG project is expected to be 88% of PNGLNG.
Slide 8 -
1. Elk/Antelope LNG project is expected to have a higher IRR (Internal Rate of Return) than any other peer project in the Australasia region. It is also expected to have the second lowest development cost and breakeven cost of any peer project in the region.
Slides 9 and 10 -
1. Total carries 75% of IOC’s share of the cost of drilling Antelope-4, Antelope-5 and Antelope-6 if required. The first $50 million drilling cost of each well will cost IOC ($50 x 0.25 X 0.365) $4.56 million. (Total will recover the carried costs from IOC by deducting them from the future resource payment)
Slide 11 -
1. Triceratops-3 is expected to spud in 2015.
Slide 16 -
1. Raptor-1 was drilled to TD at 4,032 meters (13,329 feet). They say they drilled 200 meters of limestone and 130 meters of shale. So the 7” casing is set at (4,032 - 330) 3,702 meters or 12,146 feet. That should be the top of the limestone. On March 28th they had announced the well would be drilled to a TD of 4,500 meters (14,765 feet). So it apparently came in a little higher than anticipated or was thinner than anticipated.
2. Well has flared gas and condensate.
3. IOC has applied to the Department of Petroleum and Energy for a discovery. This is the first step toward getting a PRL assigned to the discovery.
4. IOC plans to get more seismic at Raptor and then come back for at least one appraisal well in 2,015.
5. The chart indicates some limestone higher than Raptor-1 and a thickening of the limestone as we move away from Raptor-1. We now know any higher limestone is filled with gas. They have not mentioned any water production. If no water is produced at Raptor-1 we know the gas/water contact is further down dip. So at this point we do not know the lower extent of the reservoir. They may have a hint from the reservoir pressure as to how thick the gas column might be. No pressure data released to the public. If we assume the chart is to scale and we drilled 200 meters of limestone, it appears that they are depicting the limestone to be at least 500 meters (1,640 feet) thick.
Slide 17 -
1. Bobcat-1 has been drilled to TD at 3,208 meters (10,525 feet). On March 5, 2014 IOC said the well had been spudded and would be drilled to a planned depth of 3,134 meters (10,282 feet). So it appears the well reached the target depth pretty much as expected.
2. The well encountered 320 meters of limestone. In this well no mention is made of drilling shale below the limestone so it is not clear if they have drilled all the way through the limestone or not. The 5” casing must be set somewhere around (3,208 - 320) 2,888 meters (9,476 feet). This is the depth where we might expect the top of the limestone to be.
3. Wireline logging is presently underway on the 320 meters (1,050 feet) of limestone. IOC would not comment regarding the presence of hydrocarbons based on mud logs, cuttings etc. The results of the logging is known as soon as the logging tool is pulled across the formation. Should take about 1 hour. Anyway by now they know if the zone contains hydrocarbons and if the formation porosity is good enough to justify testing. We should be hearing something on this SOON.
Slide 18 -
1. Wahoo-1 was suspended on July 14, 2014 due to safety concerns about pressure.
2. IOC plans to return to Wahoo-1 in 2015.
3. IOC would not say if they plan to use the existing well and/or rig. They say the rig is still on site and all options are on the table.
4. They have mentioned a couple of times they are waiting on a suitable well head. I believe this means they intend to get a proper well head that will accommodate one or more casing strings than the previous design. This should allow them to get to the top of the pay zone with the usual 9 5/8”casing. They will also have the 10,000 psi rating if required.
5.Since we need a new well head I think this means we will start over at the surface with a new well.
Slide 19 -
1. IOC is starting a new massive seismic program (2014 Murua Seismic Survey)
in the 4th Qtr. Of 2014 which will carry on into the 3rd Qtr of 2015. This new seismic program will target some large gravity anomalies that have been previously identified in southern PPL 476 and northern PPL 474. This seismic will target some known prospects in PPL 474 such as Tuna, Wahoo, Whale, Eel, Shark and Snapper . Can’t tell if it will reach as far south as Black Bass. It will also include two or three new gravity anomalies in PPL 474 that have not been previously named. Looks like the new seismic in PPL 476 will target two very large gravity anomalies that have not been previously named. Both of these anomalies are presently drawn in to be larger than Elk/Antelope or Triceratops.
2. The 2014 Murua Seismic Survey will cover 365 km which is quite large and it has the potential to be “significantly expanded”.
3. In addition to the seismic survey IOC will also gather additional Airborne Gravity Gradiometry (AGG) Surveys. They will also have the capacity to dynamically infill to 250m over key targets.
4. They also show several NEW gravity anomalies in both PPL 474 and PPL 476 that have not previously been given prospect names.