12-03-2014, 04:55 PM
No more news on Raptor I. Sighh....
"The planned appraisal work will involve seismic, drilling and testing. It is intended that a test be
conducted to deliver a stabilized flow rate, an outcome that was not achieved in the Raptor-1
discovery well because the heavy barite we needed to control the well invaded the fracture
network"
"The planned appraisal work will involve seismic, drilling and testing. It is intended that a test be
conducted to deliver a stabilized flow rate, an outcome that was not achieved in the Raptor-1
discovery well because the heavy barite we needed to control the well invaded the fracture
network"

