'johnwgrant' pid='56707' datel Wrote:At March 17th, Ant-4 was at 2038 meters. At March 31st, 2134 meters. Drilled in 2 weeks: 96 meters (314 ft). Talk about slow !!!! (although to be fair, they stopped for some core samples). Who was it that had a posthole digger to loan them ?!?!?
John - It was me.I did sharpen the old,iron "digger" and put it back in the storeroom.But when I looked the other day,it was gone.I guess someone from IOC (or Total) "borrowed it "on the QT"......the slow drilling should go faster now at Ant 4 because it was 'very sharp' Hope we hear some positive news from PRE or OSH in the not too distant future. Good fortune to you and yours.