'Thylacine-2' pid='58555' datel Wrote:
'jft310' pid='58550' datel Wrote:[quote='Getitrt2' pid='58545' dateline='1432942242']
Thanks a bunch for the UBS report, Stavros!
I've been feeling very sleepy this afternoon and wonder how well my mind is working, but it appears to me that Figure 11 on page 8 is just plain wrong, in fact really messed up in multiple ways. Anyone else get that impression? Also, I would say on numerous Figures, the analysts are using "PRL 15" where they should be using E/A.
On page 5 it is stated that PacLNG commissioned GC for E/A estimates certification "at the time of its sale" to OSH. That is not correct, is it? I thought that was done long before.
On page 10, the analyst states, "we don't believe the current appraisal program will address this potential" of IOC's claim the western fault could be further west than previously mapped based on recent gravity and seismic survey work. Do our industry experts agree with that? If correct, it might be worth another well further west or northwest with full cost sharing if they could fit it in and get JV approval, which might not be the case.
Answer- Page 10 - Hession stated clearly they thought Ant 5 might extend further west but I can see no reason to believe that this certification will include any of this new size beyond what's proved with the new well. But it's clearly why Hession included a second certification payment . Further the hurdle of pressure communication is a low bar for connectivity to E/A and makes one think what else might be connected within the definition of pressure communication????
A question for Pet, or others on the technical staff concerning what will be proven with the long term test at Ant 5. Will the amount of gas produced in the test, taken in conjuction with the pressure reduction in the reservoir resulting from the test, be used in the certification to calculate the amount of gas remaining in the reservoir?
Thy- The volume produced during this connectivity test compared to the total reservoir volume is insignificant and the reservoir pressure drop compared to the reservoir pressure may also be insignificant. Even though they have very accurate pressure recorders it would be difficult to get the pressure difference accurate enough to be depended upon for an accurate determination of the over all reservoir volume. First we would have to assume there is no water drive. We would have to assume there is no expansion of the aquifer i.e. water is non-compressible. That is normally a good assumption but may not work too good for a large aquifer of unknown size and a pressure drop of 1 psi or less. The best method of determining the true resource volume is to use this method i.e. plot a graph of reservoir pressure vs. cumulative production but we need a significant amount of gas production and an accurate measurement of the pressure drop. We are set up to have our last call for a final certification after producing up to 20% of the gas. At that point, or before, they will probably use this method.
For this first certification I think they will still rely on measurements of porosity, water saturation, net pay thickness, areal extent and top of pay based on seismic. They will have to extrapolate these parameters from the wells that have been drilled to the overall reservoir. The connectivity test may be used to increase the connectivity uncertainty factor which may raise the resource volume a bit.