'ArtM72' pid='58560' datel Wrote:
'petrengr1' pid='58559' datel Wrote:For this first certification I think they will still rely on measurements of porosity, water saturation, net pay thickness, areal extent and top of pay based on seismic. They will have to extrapolate these parameters from the wells that have been drilled to the overall reservoir. The connectivity test may be used to increase the connectivity uncertainty factor which may raise the resource volume a bit.
Why then, Pet, are they running this extended flow test? Just to prove they have more gas than they can accurately measure by six weeks of sub 100M cfd drawdown? A practical "old school" check?
On a related question...is there a gas pressure pulse test which would send pressure waves throughout the reservoir that can be sensed by remote wells in the reservoir?
Thx in advance.
Art- If they produce 70 MMCFD for 60 days they will have removed about 0.04% of the gas. So you can see this is not a significant amount of the gas and I do not believe we can rely on the associated pressure drop to give us a reliable answer for the reservoir volume.
To answer your question:
I do not know where GLJ is now with their continuity uncertainty factor but they started off at 0.80. If they are still at 0.80 and the test proves that all of the wells are connected they will no doubt raise that number. I would assume they would raise it considerably, let’s say to 0.95. That is a very substantial increase in the total resource volume and well worth running the test. Could amount to more that 1 TCFe.
Someone is always bringing up the possibility of “compartmentalization” where we might have several blocks that are not connected. Such a reservoir might require many more wells or high angle or horizontal wells to make sure all of the blocks are drained. They would probably like to lay that question to rest if possible. Compartmentalization is not a killer of a problem, for example I believe Arun was compartmentalized.
I am not familiar with pressure pulse testing. It could probably be done but would probably be more successful in thinner zones. This zone is so massive the pressure wave might be very small upon arrival at the off set well. You would need to know how long it would take and what to look for. It might be so small that you would miss it. I will have to leave that to people that know more about it than I do.