'ArtM72' pid='58560' datel Wrote:
'petrengr1' pid='58559' datel Wrote:For this first certification I think they will still rely on measurements of porosity, water saturation, net pay thickness, areal extent and top of pay based on seismic. They will have to extrapolate these parameters from the wells that have been drilled to the overall reservoir. The connectivity test may be used to increase the connectivity uncertainty factor which may raise the resource volume a bit.
Why then, Pet, are they running this extended flow test? Just to prove they have more gas than they can accurately measure by six weeks of sub 100M cfd drawdown? A practical "old school" check?
On a related question...is there a gas pressure pulse test which would send pressure waves throughout the reservoir that can be sensed by remote wells in the reservoir?
Thx in advance.
Art, one reason for the extended flow test might be that it demonstrates to the bankers that the well is able to flow for an extended period at high production rates with an "insignificant" loss of pressure. Any lingering doubts are removed.

