Matters of Size
#1


Elk-Antelope scheme moves on to matters of size


Locations are chosen — now partners focus on drilling campaign to decide on production capacities and number of LNG trains

The Total-led owners of the Elk-Antelope gas fields in Papua New Guinea are deciding on the size and capacity of the production ­facilities for their liquefied natural gas project, Papua LNG.

Fresh from completing the task of choosing locations for the plant and central processing facility, the joint venture is now focussed on completing an appraisal drilling campaign to enable decisions on production capacities and the number and size of LNG trains.

Joint venture partner InterOil indicated this decision is expected in early 2016.

This will be followed by front-end engineering and design, with early works scheduled to begin later in 2016.

InterOil has emphasised that a “multi-train” development is on the cards, given the encouraging initial results from drilling.

Similarly, another joint venture partner, Oil Search, believes Elk-Antelope contains proven and probable contingent resources of between 5 trillion cubic feet of gas and 7 Tcf, and that was before the start of the appraisal programme.

The drilling campaign comprises the current Antelope-4 and Antelope-5 wells plus the upcoming ­Antelope-6 well.

The Antelope South exploration prospect, previously known as Antelope Deep, will also be drilled this year.

Peter Botten, Oil Search’s managing director, said results of the recent initial testing of the Antelope-5 well were “consistent with a substantial resource base with good productivity in the carbonate reservoir”.

A sidetrack is planned to begin shortly on the Antelope-4 well that will enable additional testing of the reservoir.

The joint venture had to dispose of an inadequate rig used on Antelope-4, and is instead mobilising Rig 103 to drill the sidetrack, which is planned to a total depth of 2378 metres.

Rig 103 has until now been on location at the successful Antelope-5 well, which will be subjected to more testing as part of the appraisal programme.

The Antelope-6 well is in the eastern part of the field, while Antelope South sits to the south. Meanwhile, the joint venture has met its own target of choosing a location for the Papua LNG plant by the middle of the year.

Caution Bay near Port Moresby was selected ahead of two sites in Gulf Province, which hosts the Elk-Antelope fields.

Caution Bay is the same location as the ExxonMobil-operated PNG LNG facility, and was always regarded as the logical choice for Total and its two co-venturers.

However it is understood there was significant political pressure within PNG for the LNG plant to be located in Gulf Province.

The main upstream processing facility will be located in Gulf Province near the Purari River, while 75-kilometre onshore export pipelines for gas and condensate will travel from there to the coast.

Separate 265-­kilometre subsea pipelines will connect to Caution Bay.

“The central processing facility in Gulf Province will be near the gas field with river access.

“The LNG facility near Port Moresby has potential for synergies with existing infrastructure and sufficient land for significant LNG train expansion,” said InterOil chief executive Michael Hession.

InterOil said last month the project’s estimated capital expenditure would be about 13% less than the PNG LNG project, which cost $19 billion.

The forecast construction cost for Papua LNG would be about $2050 per tonne of LNG based on two trains and liquefaction in Port Moresby.

Reply



Messages In This Thread
Matters of Size - by Tree - 07-16-2015, 05:37 AM
RE: Matters of Size - by Tusker - 07-16-2015, 06:21 AM
RE: Matters of Size - by Putncalls - 07-16-2015, 02:19 PM
RE: Matters of Size - by ebster123 - 07-16-2015, 09:09 PM
RE: Matters of Size - by jft310 - 07-16-2015, 09:43 PM
RE: Matters of Size - by Stavros - 07-17-2015, 12:52 PM