Elk-Antelope gas development activities
“During the quarter, initial production testing of the Antelope 5 appraisal well took place. The well has encountered the highest quality reservoir section seen to date in the field and the test results have demonstrated a highly productive carbonate reservoir. Further testing is planned once a sidetrack of the Antelope 4 well, which is expected to spud in August using Oil Search’s Rig 103, reaches total depth. A further appraisal well, Antelope 6, on the eastern flank of the field, is expected to complete drilling in the fourth quarter. While substantial work remains, Oil Search is confident that the Elk-Antelope field has sufficient resources to underpin at least one larger LNG train (which was the basis for our entry into PRL 15) and possibly two PNG LNG-sized trains. The transition of operatorship from InterOil to Total SA commenced during the quarter and is expected to complete in the third quarter of 2015, with Total personnel progressively being mobilised to Port Moresby. After an extensive study lasting more than 12 months, led by Total SA, the PRL 15 Joint Venture recently unanimously agreed on the locations for the Central Processing Facility (CPF), pipeline routes and LNG plant site for the proposed Elk-Antelope development (to be named the Papua LNG Project). Fourteen potential sites for the LNG plant, including seven in the Gulf Province, and seven sites for the CPF were considered, together with several alternative pipeline routes. Caution Bay was selected as the most suitable location for the LNG plant due to the availability of a large area of state land, comparable in size to the PNG LNG Project site, with favourable sea and coastal conditions for ship loading and no requirement to build a breakwater. Its easy access and close proximity to Port Moresby will facilitate materials and personnel logistics, while its location adjacent to the PNG LNG Project site will also allow for potential synergies during the construction and operations phases, which will enhance the value of the development for all stakeholders. The selection of the final development concept, including the sizing and capacity of the facilities, is expected to take place early in 2016 once appraisal and resource evaluation of the Elk-Antelope field has been completed. This development concept will then be used to determine the final Basis of Design and subsequently Front End Engineering and Design. Work has also commenced on the financing of the Papua LNG Project, with the PRL 15 Joint Venture recently appointing key advisors including Credit Agricole (Financial Advisor), Milbank (International Legal Counsel), Allens (PNG Legal Counsel) and PwC (Tax Advisor). The Papua LNG Project has the potential to have a similar impact on PNG’s Gross Domestic Product and export revenues as the PNG LNG Project. This would result in a significant boost to economic activity and opportunities for the people of PNG, particularly in the Gulf Province, where the wells, onshore pipeline and CPF are located. Progressing this project to the earliest practicable FID remains one of Oil Search’s highest priorities.”
That is what I call an update.